Obstacle removing construction method for large-diameter underground steel concrete composite structure
A combination of structure and construction method technology, applied in the direction of infrastructure engineering, buildings, sheet pile walls, etc., can solve the problems that the original developer has no follow-up development and construction capabilities, and the old buildings do not meet the needs of urban functions in the new era, etc., to achieve The effect of effective removal
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0036] In order to better understand the technical solutions of the present invention, the embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings.
[0037] It should be clear that the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.
[0038] The present application will be described in further detail below through specific embodiments and in conjunction with the accompanying drawings.
[0039] The invention provides a construction method for clearing obstacles of a large-diameter underground steel-concrete composite structure, which specifically includes the following steps:
[0040] S1, pre-processing the location of the old building.
[0041] Specifically, deter...