290results about How to "Guarantee normal construction" patented technology

Shale gas reservoir pre-fracture composite acid solution, preparation method and application thereof

InactiveCN105086989APrevent collapseCore dissolution rate maintenanceDrilling compositionAcetic acidHydrofluoric acid
The invention belongs to the field of petroleum engineering and relates to a shale gas reservoir pre-fracture composite acid solution and its preparation method and application. The composite acid solution comprises the following components: Component a) at least one component of hydrochloric acid, hydrofluoric acid, fluorboric acid, phosphoric acid, formic acid and acetic acid; and Component b) a corrosion inhibitor, a discharge aiding agent, a ferric iron stabilizer and a clay stabilizer. The composite acid solution containing different acids is selected for different reservoirs. Rock core corrosion ratio is 25-30%. A certain rock core corrosion ratio is maintained, and borehole wall collapse caused by too high corrosion ratio is also prevented. The corrosion inhibitor, the discharge aiding agent, the ferric iron stabilizer and the clay stabilizer which are used as additives have good compatibility with acid. The composite acid solution provided by the invention has advantages of fast dissolving speed, uniform mixing, high corrosion inhibition efficiency, high surface activity, good clay stabilizing effect and wide range. Applicable temperature of the composite acid solution is 20-180 DEG C. by the use of the composite acid solution, normal construction of large-scale fracturing of long horizontal-section shale gas wells can be guaranteed under the condition of existing equipment capacity.
Owner:CHINA PETROLEUM & CHEM CORP +1

Fast and highly-efficient tunneling method for large section of hard-rock tunnel in coal mine by combination of fully-mechanized tunneling and blasting driving

The invention relates to a fast and highly-efficient tunneling method for a large section of a hard-rock tunnel in a coal mine by combination of fully-mechanized tunneling and blasting driving. As shown in the figure 1, a cut hole with the borehole diameter of Phi 40.0 mm and a reliever hole with the charge diameter of Phi 35.0 mm are arranged in the section of the hard-rock tunnel with the protodyakonov coefficient f larger than 10.0 for digging out a groove cavity with s approximately equal to 14.0 m<2>. As shown in the figure 2, the cut hole adopts a three-stage oblique cut with stages deepening and angles of inclination increasing stage by stage. The consumption of charge in unit volume is determined based on the hard-rock protodyakonov coefficient and shot hole depth according to quantification of the figure 3. Three stages of oblique cuts respectively select I, III, IV-section millisecond delay detonators. A V-section millisecond delay detonator is selected by the reliever hole. The oblique cuts and the whole section of the reliever hole are detonated once with the total delay time no more than 130.0ms. After the groove cavity is formed in a blasting method. The reasonable tooth parameters are selected to rapidly expand the groove cavity to the design section and contour is finished under effect of a free surface of a fully-mechanized coal winning machine. Due to millisecond delay detonation of the oblique cut in three stages and larger borehole diameter, stemming is blocked to increase so that rocks do not affect the fully-mechanized coal winning machine after the working surface during the throwing process. The safe and efficient effect can be achieved.
Owner:湖南省煤业集团红卫矿业有限公司

Novel winter cement based grouting agent for railway concrete beam support

The invention relates to a novel winter cement-based grouting material for railroad concrete beam supports, which is formed by mixing and stirring cement, sand, finely ground steel slag powder, a swelling agent, an accelerator, a retarder, a water reducing agent and an active agent. The parts by weight of the components are as follows: 100 parts of cement, 100-250 parts of sand, 5-25 parts of finely ground steel slag powder, 3-20 parts of swelling agent, 0.1-3 parts of accelerator, 0.2-2 parts of water reducing agent, 0.1-3 parts of retarder and 1-5 parts of active agent. Finely ground converter slag which is naturally stored for 3-6 months is adopted for the finely ground steel slag powder and the specific surface area is 400-600m / kg; the total content of the calcium oxide and magnesium oxide in the finely ground steel slag powder is 5-15%. The cement-based grouting material can cause the grouting material to be used for construction at the temperature of 0-15 DEG C; the fluidity of the grouting material is still more than 240mm after being mixed for 35min and the 2h compression strength is larger than 20MPa; besides, the grouting material can endure the extreme temperature of -40 DEG C in the north of China, with strength not reduced and stable later strength; the volume of the grouting material slightly expands during hardening process, which can ensure the poured space is dense and full.
Owner:RAILWAY ENG RES INST CHINA ACADEMY OF RAILWAY SCI +1

Inverse drainage processing method in high concrete panel rock-fill dam construction period

The invention relates to a reverse drainage treatment method during the construction period of a dam body of a high rock-fill dam provided with a concrete panel, which is a drainage method for treating dam body construction waste water and underground leaked water during the construction period of the high rock-fill dam provided with the concrete panel by combination of the prior drainage and toe board and wide slot drainage. The method comprises the following steps: firstly, as for the dam body construction waste water and the underground leaked water below the elevation on the top of a flow measurement weir on the rear of the dam, reinforced gabions are used for arranging a temporary collecting well and a drainage pipe inside a rock-fill before the dam for drainage, that is the reverse drainage treatment method is performed; and secondly, as for the dam body construction waste water and the underground leaked water on the elevation on the top of the flow measurement weir on the rear of the dam, drainage is still performed by adopting the prior flow measurement weir on the rear of the dam. The method breaks through the treatment range of reversely leaked water in the dam body during the construction period of the rock-fill dam covered by the DL/T5128-2001 construction specifications of the Construction Specifications for the Rock-fill Dam Provided with a Concrete Panel, solves the problem of drainage of the leaked water in the dam body in the construction process of the high rock-fill dam, and particularly guarantees the safety of construction of the concrete panel.
Owner:CHINA GEZHOUBA GROUP CO LTD

Soil flushing repair system and method

The invention discloses a soil flushing repair system and method, and belongs to the technical field of soil repair. The soil flushing repair system sequentially comprises a crushing and screening module, a feeding and mud making module, a flushing and particle size distributing module, a water treatment module, a mud dehydration module, a water supply module and a central control room module. The crushing and screening module including a sieve with the hole diameter of a screen cloth being 30mm-60mm is arranged in front of the operating process of the feeding and mud making module. The flushing and particle size distributing module can achieve level-7 wet sieving and flushing of contaminated soil by means of water jet cutting of a high-pressure spraying system and mechanical vibration of a vibration motor, and discharging cleanliness and recoverability can be guaranteed. The mud dehydration module is provided with a drying workshop and used for preventing rainwater from wetting dehydration mud cakes, guaranteeing subsequent drying of the mud cakes and controlling secondary pollution of pollutants in the mud cakes. By the adoption of the soil flushing repair system and method, the problem that the screen cloth can be blocked easily due to the uneven feeding grain size in the prior art is solved, and the problems of flushing dehydration mud cake storage, subsequent drying and secondary pollution of the pollutants are also solved.
Owner:BCEG ENVIRONMENTAL REMEDIATION CO LTD

Support vector machine-based mine fiber grating monitoring system missing data compensation method

ActiveCN107392786ASolve the problem of missing compensationSensitive Sensing CharacteristicsData processing applicationsMeasurement devicesFiberGrating
The invention relates to a support vector machine-based mine fiber grating monitoring system missing data compensation method and belongs to the monitoring system missing data compensation method. The method includes the following steps that: step 1, a mine fiber grating monitoring system data sensing device performs data acquisition; step 2: monitoring data collected by the fiber grating sensing device are represented by time sequences and are preprocessed; step 3, the kernel function of a support vector machine is selected and constructed; step 4, the hyper-parameters of the support vector machine are selected and determined; step 5, a kernel matrix is built according to the determined kernel function, a loss function and penalty parameters, an optimization algorithm is adopted to get the optimal parameter value of the support vector machine; and step 6, the regression function model of the support vector machine is established, fitting regression analysis is performed on the data, so that the compensation result of missing data is obtained, and compensation work for the missing data is performed. With the support vector machine-based mine fiber grating monitoring system missing data compensation method of the invention adopted, the monitoring missing data can be compensated, and therefore, the monitoring data can be improved, and the data are closer to real and reliable data, and the safety production, construction and stability of a mine can be ensured.
Owner:CHINA UNIV OF MINING & TECH

Offshore wind power plant electronic fence and acousto-optic early warning equipment and method

The invention provides an offshore wind power plant electronic fence and acousto-optic early warning equipment, which at least comprises: electronic fence corollary equipment for establishing a virtual electronic fence in an offshore wind power plant and an electronic fence for construction ship patrol; and early warning equipment that performs early warning according to the target entering the electronic fences. Sensors such as radar, AIS, CCTV and the like are used for acquiring field information; all-around monitoring is achieved, and timely early warning is achieved through acousto-optic warning equipment when a ship intrudes into a wind power early warning area; compared with a real wind power water area warning sign, a navigation water area is not occupied, visual lookout is not affected, and the problems that the real warning sign is large in installation and construction difficulty, high in cost, difficult to maintain and the like are solved. The AIS, radar, CCTV, VHF and otherdevices are linked and subjected to information fusion, all mistakenly-entering ships can be effectively captured, early warned, called and expelled through the arrangement, and ship navigation safety and offshore wind power plant construction and operation safety are effectively guaranteed.
Owner:武汉欣海远航科技研发有限公司

Water stopping treating method for water burst of tunnel fracture crushing zone

The invention relates to a treating method for water burst of a mountain area tunnel fracture crushing zone. The treating method comprises the following steps that according to the tunnel stopping zone underground water system boundary, the boundary condition, the initial condition and fault factor generalization, an MODFLOW procedure based on a porous medium model is adopted to conduct model building and hydrogeological parameter identification on a bedrock mountain area fissured waterbearing stratum; tunnel factor generalization, instantaneous water inflow calculation and stable water inflowcalculation are conducted on the basis of a hydrogeological model; and on the basis of the tunnel water inflow calculation result, the drain hole water stopping pressure-bearing mode of tunnel surrounding rock is determined by combining with tunnel lining pressure reduction to conduct a water stopping pressure-bearing test so as to determine relevant parameters, and thus tunnel drainage is implemented by applying an optimized water control mode. Pressure releasing drainage hole and lining construction is combined with eco-society water demands to form a comprehensive treating method, the pressure-relief part can be flexibly adjusted, the construction pressure is decomposed, the surrounding rock is reinforced, and engineering building and safety are effectively ensured.
Owner:TONGJI UNIV

Method for constructing bearing platform on deepwater and rigid impermeable layer

The invention discloses a method for constructing a bearing platform on a deepwater and rigid impermeable layer. The method comprises the following steps of: constructing foundation bored piles by means of an artificial island or building a platform; inserting and driving steel plate piles in a soil layer or on a covering layer of the artificial island, so as to form a steel plate pile cofferdam; assembling a short casing box cofferdam, arranging an upper inner support and a lower inner support of the steel plate pile cofferdam, gradually taking earth, lowering the short casing box to the impermeable layer, and alternatively lowering and fixing the upper inner support and the lower inner support of the steel plate pile cofferdam to designed positions; pouring top seal concrete between the steel plate piles and the short casing box cofferdam; and pumping the water in the steel plate pile cofferdam to form an anhydrous environment, and constructing the bearing platform. According to the method, the underwater top seal concrete is poured between the steel plate pile cofferdam and the short casing box cofferdam, the water is prevented from entering into the cofferdams from the bottom part after the concrete is combined with the impermeable layer; the stable structure of the cofferdams can be ensured; and the anhydrous environment can be formed in the cofferdams, the bearing platform can be constructed under anhydrous environment, and the construction quality can be ensured.
Owner:CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD +1

Method for building riprap levee island wall of offshore artificial island by large box barge

The invention discloses a method for building riprap levee island wall of an offshore artificial island by a large box barge, comprising the following steps: (1) remodeling a large box barge; (2) dragging the large box barge to an area for building the riprap levee island wall of the offshore artificial island to facilitate the longitudinal centerline to be vertical to the axis of the riprap levee island wall of the offshore artificial island; (3) respectively parking transport ships at the both sides of the large box barge to unload stone material to the large box barge; (4) with excavators and waggon tremie riprap construction stone material piling platform of the large box barge provided, facilitating the large box barge to be driven to the stone piling platform by steel butt straps to riprap and deal with the slopes to build a section of riprap levee, repeating the process so as to facilitate the riprap levee island wall to move forward section by section to be formed and finally completed. In the invention, the on-water construction of the island wall of the offshore artificial island is transformed into onshore advance, thus reducing influence of stormy weather on the construction and greatly accelerating construction speed of the artificial island.
Owner:CHINA COMM 2ND NAVIGATIONAL BUREAU 3RD ENG

Sampling device for geotechnical engineering investigation

The invention provides a sampling device for geotechnical engineering investigation, which comprises a box body, a sampling drill bit, a driving mechanism, a depth measuring mechanism and a water suction pump, the box body is divided into a working cavity and a sampling cavity, and the depth measuring mechanism comprises an annular plate, a transmitting pipe and a receiving pipe; before sampling,the depth of to-be-sampled soil is judged according to a to-be-constructed geotechnical engineering structure, after the device body is moved to a to-be-sampled area, water in the sampling cavity is pumped away through the water pump, then the driving mechanism drives the sampling drill bit to be inserted into the soil, and the annular plate arranged on the outer wall of the sampling drill bit canbe blocked on the surface of the soil; the distance between a transmitting tube and the receiving tube is increased, the height between the annular plate and the soil surface can be obtained according to the infrared light transmitting time of the transmitting tube and the infrared light receiving time of the receiving tube, and therefore the depth of the sampling drill bit inserted into soil canbe obtained, and sampling can be conducted after the sampling drill bit reaches the preset depth. And the sampled soil sample can correctly reflect the properties of the base layer.
Owner:ZHONGJIAN HUACHEN (HAINAN) CONSTR G ROUP CO LTD

Method for reducing temperature of frozen earth and preventing water catchment in pit for permafrost region

InactiveCN102733405AImprove stabilitySolve engineering problems of water blockingProtective foundationPondingWater leakage
The invention relates to a method for cooling peripheral frozen earth and preventing water catchment in an excavation pit for a permafrost region. The method is characterized in that a pit slot is excavated at a position which is 0.5-5 m far away from the rim of the designed pit; the slot depth is a depth being 0-100 cm below underground permafrost table; a cooling pipe is paved at the bottom of the pit slot; a waterproof film is paved on the cooling pipe, the bottom of the slot, and the wall of the pit to a ground surface, and refilled and punned with filled earth; and the cooling pipe injected with circular freezing liquid is connected with a refrigerator on the ground surface through a hose. Shown by practices, with the adoption of the method provided by the invention, the problems of melting and stability loss of the frozen earth and the frozen earth in the excavation pit in a warms-season construction process and water leakage and water collection of underground water can be solved through the effective combination of refrigeration and water insulation, so that the permafrost stability can be effectively protected, and the normal construction and the long-term stability of the Qinghai-Tibet direct-current networking engineering in the permafrost region can be ensured.
Owner:COLD & ARID REGIONS ENVIRONMENTAL & ENG RES INST CHINESE +1

Method for preparing copper ion selective adsorbent by sodium alginate/chitosan compounding

The invention discloses a method for preparing a copper ion selective adsorbent by sodium alginate/chitosan compounding. The method comprises the following steps of firstly preparing a copper alginatepellet, afterwards, compounding the copper alginate pellet with chitosan, next, carrying out aldehyde pre-cross-linking and epoxy chloropropane cross-linking on a copper alginate/chitosan composite pellet, and finally eluting a copper ion by using hydrochloric acid to obtain the copper ion selective adsorbent. According to the method, the copper ion is used as a curing agent of sodium alginate and a template of ionic imprinting; a calcium ion is not added in a whole course; the construction of an imprinting site of the copper ion is ensured; the stepwise cross-linking is carried out on the composite pellet by adopting different cross-linking agents; the cross-linked structure is optimized; the recognizability of the imprinting site to the copper ion is enhanced; the selectivity of the adsorbent to the copper ion is improved. The method is wide in raw-material source, simple in preparation process and lower in production cost, and the adsorbent prepared by the method provided by the invention is high in adsorption quantity to the copper ion and good in selectivity, can be repeatedly recycled, moreover, is environmentally friendly, and has wide development and application prospects.
Owner:FUZHOU UNIVERSITY

Making method for simulated hole defects of nuclear safety three-level HDPE pipeline

The invention relates to the technical field of detection and evaluation authentication, and provides a making method for simulated hole defects of a nuclear safety three-level HDPE pipeline. The method comprises the steps of S1, selecting a test pipeline, and acquiring a backfilling amount L at a pipeline defect after the test pipeline is welded; S2, selecting a simulated pipeline, and marking out a plurality of positions used for making the simulated hole defects on the simulated pipeline; S3, drilling the marked positions to obtain simulated holes, wherein the depth of each simulated hole is larger than the backfilling amount L; and S4, mutually welding one ends, with the simulated holes, of two simulated pipelines, or welding one end, with the simulated holes, of the simulated pipelinewith a normal pipeline to form a simulated joint with the hole defects. When an ultrasonic nondestructive detection method is adopted, the sizes and positions of the hole defects in the simulated joint can be accurately detected out, so that the detection precision of the detection method is high; and therefore, the hole defects in the pipeline joint in construction can be accurately detected out, and the construction of the HDPE pipeline has the advantages of quality guarantee and high safety.
Owner:GUANGDONG NUCLEAR POWER JOINT VENTURE +3

Roadbed protective system in debris flow gully and implementation method for roadbed protective system

The invention discloses a roadbed protective system in a debris flow gully and an implementation method for the roadbed protective system, and the roadbed protective system is arranged along the debris flow gully (7). The roadbed protective system comprises a blocking dam (2), a stop and deposit field (3), a drainage guide culvert (4) and an energy dissipation slot (5), wherein the blocking dam (2) is positioned in an upstream channel of the debris flow gully (7); the stop and deposit field (3) is positioned between the blocking dam (2) and a roadbed filling body (1) arranged at the downstream; an inlet of the drainage guide culvert (4) is mutually jointed with the stop and deposit field (3); the drainage guide culvert (4) transversely penetrates through the roadbed filling body (1); and a downstream slope surface at the outlet of the drainage guide culvert (4) is jointed with the energy dissipation slot (5). The roadbed protective system overcomes the defects that a drainage guide structure in the prior art is easily damaged and finally causes the roadbed to be destroyed by rush of water, and has the advantages of reducing scouring, on the both sides of the channel, of debris flow, and prevents most of rock blocks from discharging.
Owner:CHANGJIANG SURVEY PLANNING DESIGN & RES

High-performance cold patch asphalt mixture and preparation method thereof

The invention provides a high-performance cold patch asphalt mixture and a preparation method thereof. The high-performance cold patch asphalt mixture is prepared from the following components in parts by mass: 100 parts of aggregate, 2.5-3.5 parts of mineral powder and 4.5-5.5 parts of a cold patch asphalt liquid. The preparation method comprises the following steps: preparing an additive from a coumarone resin, a terpene resin and an ethylene-vinyl acetate copolymer according to a formula; selecting matrix asphalt, a diluent and the additive according to a mass ratio of 100: (22-25): (6-8), heating the matrix asphalt, adding the diluent, dispersing under a high-speed dispersion instrument, cooling, adding the additive, and dispersing to obtain a cold patch asphalt liquid; and selecting and weighing aggregate, mineral powder and the cold patch asphalt liquid according to the mass parts, carrying out heat preservation development at different temperatures respectively, putting into a mixing pot, and mixing to obtain the cold patch asphalt mixture. According to the high-performance cold patch asphalt mixture provided by the invention, the storage stability, the construction workability, the Marshall stability, the water stability and the adhesive property of the cold patch asphalt mixture can be remarkably improved, and the purpose of prolonging the service life of the cold patch asphalt mixture is achieved.
Owner:CHANGSHA UNIVERSITY OF SCIENCE AND TECHNOLOGY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products