Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

80results about How to "Guarantee normal construction" patented technology

Ultra-large and ultra-long digital oil cylinder based on novel key component

ActiveCN119084397AGuarantee normal constructionImprove the technical level of the whole machineFluid-pressure actuator testingUltra high speedStructural engineering
The invention discloses an ultra-large and ultra-long digital oil cylinder based on a novel key component. The ultra-large and ultra-long digital oil cylinder comprises an oil cylinder body structure, an oil cylinder V-group main seal, a knuckle bearing, a piston rod laser cladding coating, an oil cylinder state monitoring and adjusting unit, an oil cylinder bearing monitoring and evaluating unit, a piston rod coating monitoring and evaluating unit, an industrial personal computer, a display screen and an audible and visual alarm. The knuckle bearing is a domestic self-lubricating knuckle bearing. The V-group seal is a domestic seal and comprises a pressing ring, a sealing ring and a supporting ring. The piston rod laser cladding coating is made of domestic self-developed powder, and an ultra-high-speed laser cladding construction technology is adopted. Fine control over the pile driving barge pile frame main oil cylinder under different working conditions is achieved, and the use safety of the pile driving barge pile frame main oil cylinder is remarkably improved; online performance evaluation and state real-time detection of the knuckle bearing of the oil cylinder are achieved, and long-time safe use of the oil cylinder is guaranteed; the residual life of the knuckle bearing in the service process is predicted, the knuckle bearing is planned and replaced in advance, and the construction period is prevented from being delayed.
Owner:CCCC SECOND HARBOR ENGINEERING CO LTD +1

Building design and building material management system

The invention discloses a building design and building material management system, and relates to the field of building engineering material management, the building design and building material management system comprises an information acquisition module, a preliminary analysis module and a prediction analysis module, and the meteorological data of each completed construction stage corresponding to a target building and the consumption information corresponding to various building materials are intelligently analyzed; according to the method, the meteorological influence set of the to-be-constructed stage corresponding to the target building is obtained, and the basic loss coefficient corresponding to the target building is obtained, so that the accuracy and effectiveness of building material loss evaluation are improved; comprehensive analysis is carried out in combination with the actual building material consumption information of each completed construction stage corresponding to the target building and the storage information of various building materials in the material storeroom corresponding to the target building, so that the purchase demand corresponding to the scientific and reliable target building is obtained, and resource saving and cost reduction are facilitated; and normal construction of the target building is further guaranteed.
Owner:JIANGSU DAFA CONSTR ENG CO LTD

Overwater moving construction platform device of piling machine

The invention relates to the technical field of platforms, in particular to a pile machine water moving construction platform device which comprises a pile casing, an annular bottom plate is slidably connected to the outer end of the pile casing, an annular movable plate is slidably connected to the upper end of the annular bottom plate, and the upper end face of the annular bottom plate is sunken downwards to form an annular groove; an output shaft of the first driving equipment is connected with the rotating gear; the lower end of the protective cylinder is communicated with annular sawteeth; a lifting part is mounted at the upper end of the annular movable plate; a clamping part is arranged in the lifting part; by means of the design, the pile casing can be effectively inserted into the ground in water, stable installation of the pile casing is effectively guaranteed, the probability that leakage is generated at the lower end of the installed pile casing is effectively reduced, subsequent normal construction is effectively guaranteed, and the using effect is improved.
Owner:JIANGSU HENGJE ROAD & BRIDGE ENG CO LTD

Pouring trolley

The invention relates to the technical field of pouring, in particular to a pouring trolley which comprises an outer mold mechanism, an inner mold mechanism and an outer mold mechanism. The inner mold mechanism comprises a second walking assembly and an inner mold assembly. When the outer mold assembly is located at the first pouring position and the inner mold assembly is located at the second pouring position, a pouring cavity is defined by the end plug plate, the outer mold assembly and the inner mold assembly. According to the embodiment of the invention, by arranging the outer mold mechanism and the inner mold mechanism, free switching can be automatically carried out from the pouring position to the walking position, so that position fixing can be automatically realized at the pouring position, a traditional pull rod fixing mode is not needed, and the wall body construction quality is improved. Moreover, after pouring is finished, dismantling is not needed, and the device is dragged to the next pouring construction through the corresponding walking assembly, so that the construction efficiency is greatly improved, and meanwhile, the operation steps of technicians are simplified.
Owner:CHINA FIRST HIGHWAY ENGINEERING CO LTD +1

Method for detecting working performance of concrete in mixer truck tank in real time

The invention discloses a method for detecting the working performance of concrete in a mixer truck tank in real time, and the method is used for monitoring the flowability of the concrete in real time. The dynamic yield stress of concrete is calculated by measuring data such as the inclination angle between the concrete liquid level in the concrete tank car and the horizontal plane, the contact area of the concrete in contact with the tank body and the cross section area of the tank body in the transportation process, and the roughness of the concrete surface is measured through a laser scanner. And judging whether the concrete is in a qualified or segregated or dry and thick state by comparing the dynamic yield stress with the corresponding threshold value or comparing the roughness with the corresponding threshold value. The monitoring method provided by the invention has the following advantages: after qualified concrete is discharged, the performance change condition of the concrete in the tank of the concrete tank truck can be detected in real time in the transportation process; when the concrete performance is not good, early warning can be sent to quality control personnel, and guarantee is provided for efficient construction.
Owner:HUNAN CSCEC5B CONCRETE +3

Automatic grouting device and method for anchoring support

The invention relates to the field of engineering construction, and discloses an automatic grouting device and method for anchoring supporting, the automatic grouting device comprises a mounting plate, a production mechanism is fixedly connected to the middle of the mounting plate, and a feeding mechanism is connected to one side of the production mechanism; the executing mechanism is connected with the output end of the feeding mechanism; the executing mechanism comprises a limiting box, stabilizing cylinders are fixedly connected to the two sides of the limiting box, and an outer ferrule is rotationally connected to the middle of the limiting box; according to the anchor cable grouting device, a grouting pipeline and an anchor cable can enter the anchor cable at the same time, then pressure grouting is carried out, coherent grouting work is achieved, the overall working procedures are reduced, then labor input is reduced, the overall efficiency is improved, the work amount is reduced, and the construction cost is reduced. And construction is ensured.
Owner:SOUTH CHINA UNIV OF TECH +1

Reinforcing steel bar sleeve grouting material for high-strength micro-expansion assembly type concrete structure

The invention discloses a reinforcing steel bar sleeve grouting material for a high-strength micro-expansion fabricated concrete structure. The reinforcing steel bar sleeve grouting material is prepared from the following raw materials in parts by weight: 735 to 795 parts of cement, 15 to 85 parts of silica fume, 80 to 90 parts of lithium slag powder, 9 to 36 parts of magnesium slag powder, 500 to 800 parts of quartz sand, 100 to 400 parts of basalt sand, 9 to 12.6 parts of a water reducing agent, 0.9 to 4.5 parts of a retarder, 0.9 to 4.5 parts of a reinforcing agent, 0.6 to 1.2 parts of a de-foaming agent, 0.6 to 1.2 parts of a suspension stabilizer, 0.1 to 0.3 part of a plastic expanding agent and 45 to 72 parts of a UEA expanding agent. The grouting material disclosed by the invention has the advantages of high strength, micro-expansion, good fluidity, no bleeding, no segregation and the like, and meets the use requirements of an assembled concrete structure.
Owner:SICHUAN INSITITUTE OF BUILDING RES +1

Drainage pipeline structure for slip form construction

The drainage pipeline structure comprises a drainage blind ditch, a communication part and a drainage part, the drainage blind ditch is arranged between a rock mass surface and a vertical shaft lining, and the drainage blind ditch is used for collecting leakage water of a rock mass; the communicating part comprises a three-way connecting piece, a pre-buried drainage pipe and a filling material, the pre-buried drainage pipe extends in the thickness direction of the vertical shaft lining and penetrates through the vertical shaft lining, the three-way connecting piece communicates with the drainage blind ditch and the pre-buried drainage pipe, and the filling material is arranged on the side, away from the three-way connecting piece, of the pre-buried drainage pipe and detachably connected with the pre-buried drainage pipe; the end parts of the embedded drainage pipe and the filling material do not exceed the inner wall surface of the vertical shaft lining; and the drainage part is configured to be connected with the pre-embedded drainage pipe after the filling material is detached, and the drainage part is used for draining leakage water. The drainage pipeline structure for the slip form construction does not affect normal construction of the slip form, and can ensure safe drainage of mountain leakage water after the slip form construction is completed.
Owner:POWERCHINA HUADONG ENG CORP LTD

Bidirectional cutting mixing pile machine and method capable of quickly connecting and disconnecting drill rod

PendingCN119640779AGuarantee normal constructionEnsure the completion of constructionDrill bitsDrilling rodsArchitectural engineeringMachine
The embodiment of the invention relates to the technical field of foundation construction, and discloses a two-way cutting mixing pile machine and method for quickly connecting and disconnecting a drill rod, and the two-way cutting mixing pile machine comprises a walking device used for driving the device to move on a foundation; the tower frame is arranged on the walking device, and the tower frame is used for providing support; and a connecting device. According to the bidirectional cutting mixing pile machine and method for quickly connecting and disconnecting the drill rods, through the arrangement of the first drill rod and the second drill rod which are detachable and connectable, when the preset depth of a mixing pile is large, the completion of construction can be ensured through the assembly relay of the two-section type first drill rod and the second drill rod, and certainly, the construction efficiency is improved. Due to the fact that the two-section type first drill rod and the two-section type second drill rod are assembled and constructed, the height of the portions, exposed out of the foundation, of the first drill rod and the second drill rod after the first drill rod and the second drill rod are assembled can be controlled, for example, the stipulation that the height is not larger than 35 m can be met, safety is improved, and meanwhile the stipulation of related policies is met.
Owner:SHANGHAI STRONG FOUND ENG

Intelligent navigation system for assembly and disassembly of tower crane

The utility model provides an intelligent navigation system for mounting and dismounting of a tower crane, which comprises an equipment management unit, a handheld terminal and a camera shooting unit, the handheld terminal and the camera shooting unit are respectively used for recording and confirming a construction process, and the equipment management unit and the camera shooting unit are respectively arranged on a construction base body. The equipment management unit is connected with the handheld terminal through the risk monitoring platform, the handheld terminal is connected with the camera shooting unit through the algorithm server, the risk monitoring platform is electrically connected with the algorithm server, the device further comprises a pull rope type displacement sensor arranged on the tower crane, and the bottom of the tower crane is fixedly connected with a construction base body. The device is compact in design, can greatly improve the safety in the mounting and dismounting operation process of the tower crane, ensures the construction efficiency, and has good economic benefits.
Owner:CCCC SECOND HARBOR ENGINEERING CO LTD

Tunnel construction safety emergency method and device based on artificial intelligence

The invention provides a tunnel construction safety emergency method and device based on artificial intelligence, and relates to the technical field of artificial intelligence. Firstly, position distribution information and safety emergency feature information of persons in a tunnel are obtained based on video image information; then, judging whether a field safety accident is found in the tunnel or not based on the environment information and / or the video image information, and identifying the type and the occurrence place of the field safety accident; then, selecting a target person with scene safety accident handling experience in the tunnel based on the type of the scene safety accident, the position distribution information of the persons in the tunnel and the safety emergency feature information of each person; and finally, notifying the target person to go to the site where the on-site safety accident occurs to carry out safety emergency processing. According to the mode, the target person with accident handling experience can timely arrive at the site to handle the accident, the handling efficiency of the tunnel site safety accident is improved, the tunnel construction risk is reduced, and the tunnel safety construction is ensured.
Owner:中国水利水电第七工程局有限公司 +1

Waterproof fence equipment for water conservancy construction

The utility model discloses waterproof fence equipment for water conservancy construction, which comprises a baffle plate, a supporting device fixedly connected to the bottom of the baffle plate, a spraying device and a swinging device fixedly mounted on the top of the baffle plate, the swinging device comprises a motor mounting plate, a motor is fixedly connected to the motor mounting plate, and a rotating shaft is rotatably connected to one side of the motor. The motor mounting plate is fixedly connected with a rotating shaft mounting plate, the rotating shaft is inserted into a through hole of the rotating shaft mounting plate, one side of the rotating shaft is fixedly connected with a rotating arm, one end of the rotating arm is rotationally connected with a power transmission arm, one end of the power transmission arm is rotationally connected with a swinging arm, and one side of the motor mounting plate is fixedly connected with a swinging shaft; and the swinging shaft is inserted into the through hole of the swinging arm. By arranging the swinging device and the spraying device, the water pump and the motor are started in the construction process, and the motor drives the spraying device to swing, so that multi-angle spraying is realized, and dust in air is greatly reduced.
Owner:JIANGXI ZHONGHENG JIAQIANG ENTERPRISE SERVICE CO LTD

Harmless curing and stabilizing treatment method for phosphogypsum

The invention discloses a phosphogypsum harmless curing and stabilizing treatment method which comprises the following steps: step 1, adding a curing agent into a fly ash material or a cement material, and uniformly stirring and mixing to prepare an additive A; 2, taking kaolin, adding an additive A into the kaolin, and uniformly stirring and mixing to prepare a mixture B; 3, adding ardealite into the mixture B, uniformly stirring and mixing, and adding water in the mixing process to prepare a blank; fourthly, the blank is subjected to mold pressing, and a blank mold is manufactured; and fifthly, the blank mold is dried, and a finished building material product is obtained. Compared with the prior art, the phosphogypsum curing agent can enable phosphogypsum to achieve harmless and curing stable effects.
Owner:HUNAN JUNYAO YONGSHENG MATERIALS TECHNOLOGY CO LTD

A kind of automobile original low-temperature stone-impact resistant water-based mid-coat coating and its preparation method and application

The present invention relates to a kind of automobile original factory low temperature stone impact resistant water-based mid-coat coating and its preparation method and application, the mid-coat coating composition includes aliphatic hydroxyl functional polycarbonate polyurethane dispersion, water-based aliphatic polyurethane-urea dispersion, water-based closed polyisocyanate crosslinking agent, amino resin, dispersant, defoamer, wetting agent, pigment, filler, fumed silica, cosolvent and water. The coating crosslinking density obtained by the modified polyurethane resin, amino resin and isocyanate crosslinking agent system adopted in the present invention is high, and the toughness is good, and the anti-stone impact performance is significantly improved, especially the anti-low temperature stone impact performance can reach level 1, and the mid-coat coating of the present invention is quick-drying, easy to construct, has higher gloss and fullness, leveling, good adhesion and water resistance, and is equipped with automobile original factory color paint and varnish, and can be widely used in electrophoretic coating or metal substrate.
Owner:GUANGDONG YATU CHEM

Wire supporting and adjusting device for power grid construction and use method of wire supporting and adjusting device

The invention relates to the technical field of power grid construction, and discloses a wire supporting and adjusting device for power grid construction and a using method thereof, the wire supporting and adjusting device comprises a main body, two reinforcing plates are fixedly connected to the outer surface of the main body, supporting plates are fixedly connected to the ends, away from the main body, of the reinforcing plates, and a fixing bolt is fixedly connected between the two supporting plates. The wire can be pushed to move backwards during reverse movement, reverse supporting force is provided, the tension of the cable is maintained to be stable jointly, it is ensured that no matter how the wire moves, the wire can be effectively clamped by the two clamps, the cable can bear certain clamping force and friction force between the two adjusting mechanisms, and therefore the cable can be stably clamped. And the condition that the wire droops or swings when the wire is pulled during construction due to the action of external force wind and the action of self gravity in the construction process is reduced.
Owner:国网黑龙江省电力有限公司鹤岗供电公司

A pile driver mobile construction platform device on water

The present invention relates to the technical field of platforms, and in particular to a pile driver mobile construction platform device on water, comprising a casing, an outer end of the casing being slidably connected to an annular base plate, an upper end of the annular base plate being slidably connected to an annular movable plate, an upper end surface of the annular base plate being recessed downward to form an annular groove, an annular gear being installed inside the annular groove toward the inner wall, an outer end of the annular gear being meshed with a rotating gear, a first driving device being installed on the upper end of the annular movable plate, an output shaft of the first driving device being connected to the rotating gear, an annular sawtooth being installed in communication with the lower end of the casing, a lifting member being installed on the upper end of the annular movable plate, a clamping member being arranged in the lifting member, a plurality of functional members being equidistantly arranged on the lower end of the annular base plate, a plurality of air bags being equidistantly installed on the lower end of the annular base plate, and outer ends of the plurality of air bags being connected to an installation connecting pipe. The design enables the casing to be effectively inserted into the ground in the water, effectively ensures stable installation of the casing, effectively reduces the probability of leakage etc. occurring at the lower end of the installed casing, effectively ensures subsequent normal construction, and improves the use effect.
Owner:JIANGSU HENGJE ROAD & BRIDGE ENG CO LTD

Shield underground docking multi-stage main drive retaining design method

PendingCN119288507AImprove economyReasonable structural stressTunnelsShield tunnelingMechanical engineering
The invention discloses a multi-stage main drive retaining design method for shield in-ground docking, relates to the technical field of shield tunnel engineering, and is used for performing main drive retaining reinforcement on a preceding shield during shield in-ground docking, and the shield in-ground docking is divided into two stages based on the distance between the preceding shield and a following shield. A retaining steel plate is arranged along the outer surface of the main drive in the first stage, when the left and right reaction torque oil cylinders are not disassembled, the main drive retaining steel plates of the upper semicircle and the lower semicircle are installed firstly, the main drive left and right reaction torque oil cylinders are disassembled in the second stage, the retaining steel plates continue to be arranged at the vacant positions, and theoretical support is provided for reinforcing and retaining construction of the main drive. Therefore, the safety and the stability of the advanced shield tunneling machine structure in the butt joint process are ensured. Furthermore, by designing the plane size of the main drive retaining steel plate, determining the welding seam range, determining the retreating force of the telescopic oil cylinder in the first stage and the second stage, checking and determining the thickness, the number and the distance of the retaining steel plates in the first stage and the second stage and the like, the scheme can be actually applied to the ground and is suitable for industrial popularization.
Owner:CCCC TUNNEL ENG CO LTD

Anti-climbing structure for tower crane

The anti-climbing structure comprises a tower crane frame body, a crawling ladder, an outer side protection plate and an iron closing plate, the crawling ladder is arranged in the tower crane frame body, corner connecting pieces and cable-stayed reinforcing pieces are integrally arranged on the tower crane frame body, the outer side protection plate is inserted between the corner connecting pieces and abuts against the outer side portion of the tower crane frame body, and the iron closing plate is arranged on the outer side protection plate. A fixing bolt I is arranged on the corner connecting piece, an externally-connected rectangular groove is formed in the cable-stayed reinforcing piece, the externally-connected rectangular groove and the outer side protection plate are installed in an inserting and limiting mode, a lug plate base is arranged on the cable-stayed reinforcing piece, a fixing bolt II is installed between the lug plate base and the tower crane frame body, and the iron closing plate is arranged in the tower crane frame body in a hinged mode. And a spring telescopic locking piece is arranged in the iron sealing plate, a plug pin is arranged on the spring telescopic locking piece in a telescopic mode, and a pin hole matched with the plug pin in an inserting and limiting mode is formed in the inner side of the tower crane frame body. The anti-climbing tower crane has the advantages that the anti-climbing tower crane has the anti-climbing function, and the outer side and the inner side of the tower crane are prevented from climbing.
Owner:ZHEJIANG JINHUI CONSTRUCTINO CO LTD

A sensor-based intelligent monitoring method for reinforced concrete pile pouring

The present invention belongs to the technical field of concrete pouring construction, and specifically discloses a sensor-based reinforced concrete bored pile pouring intelligent monitoring method. The method performs geological survey when drilling by using multi-stage drilling equipment, and performs surrounding hole wall risk perception and drilling risk perception when switching the drill bit based on the geological survey result, thereby flexibly adjusting the drilling state, which is not limited to the drilling speed adjustment. On the one hand, it can meet the adjustment needs to the maximum extent, and on the other hand, it can avoid the influence of the frequency adjustment of the drilling speed on the construction process and equipment wear. At the same time, after the drill bit switching operation is executed, the drilling deviation is identified, and when the drilling deviation is identified, targeted correction adjustment is performed based on the geological changes before and after the switching and the drilling deviation amount. The method is not limited to the stop correction, and in some cases, the drilling process correction can be realized, thereby ensuring the continuity of construction to a certain extent, and at the same time, the stability of the hole wall can be better controlled.
Owner:ANHUI WATER CONSERVANCY DEV CO LTD

Continuous coating filtering device for wall surface construction

The utility model relates to a continuous coating filtering device during wall surface construction, and aims to solve the problems that a stainless steel filter screen arranged in a current filtering device is used for filtering coatings, the horizontally-arranged stainless steel filter screen is easily influenced by particles to be blocked in the continuous spraying process, the filtering effect of the stainless steel filter screen on subsequent coatings is influenced, and the service life of the stainless steel filter screen is prolonged. The wall coating device comprises a mounting base and a driving mechanism arranged at the top of the mounting base, a filtering assembly is detachably mounted at the bottom end of the mounting base, a pushing and extruding mechanism connected to the driving mechanism is arranged in the middle of the bottom end of the mounting base, and the pushing and extruding mechanism is movably arranged in the filtering assembly; according to the utility model, the columnar filter screen is matched with a plurality of spiral scrapers to carry out spiral pushing, so that the problem of blockage of coating particles is avoided, the filtering effect on subsequent coating is guaranteed, and continuous and long-time wall coating construction is guaranteed.
Owner:CHUZHOU MINGSHENG BUILDING DECORATION ENGINEERING CO LTD

Fabricated station force transmission key

The utility model discloses an assembly type station force transmission key, and relates to the technical field of force transmission keys, the assembly type station force transmission key comprises a bolt sleeve integrally formed with an assembly type block, the bolt sleeve is internally in threaded connection with a force transmission bolt, and one side of the bolt sleeve is provided with a detachable rotating piece in threaded connection with the force transmission bolt. Stable work of the force transmission key is achieved through mutual cooperation of the bolt sleeve, the force transmission bolt and the detachable rotating piece, and the whole force transmission key is simple in structure, small in size, suitable for assembly type station structures of different thicknesses or types, especially suitable for assembly type stations with small fertilizer groove width, simple in installation technology, small in construction period influence and high in practicability. Repeated retightening can be performed according to deformation of the enclosure structure, and the retightening process is simple; and the grouting head is installed to conduct grouting plugging on the force transmission key, and construction and structural defense of the assembly type station can be effectively guaranteed.
Owner:中交(广州)建设有限公司 +1

Basement retaining wall structure and basement structure

The utility model discloses a basement retaining wall structure and a basement structure, and belongs to the field of buildings, in order to solve the problem that in the prior art, the construction period for building side walls and supporting and retaining structures of basement walls is long, the basement retaining wall structure comprises a wall body (6), a buttress (14), a wall toe (3), a wall heel (1) and an anti-skid key (2), the buttress (14) is connected with the wall body (6) and the wall heel (1), and the anti-skid key (2) is connected with the buttress (14). The wall heel (1) and the anti-skid key (2) are connected up and down, the anti-skid key (2) is of a strip-shaped structure, and the extending direction of the anti-skid key (2) is the same as that of the wall body (6). The basement retaining wall structure not only can be used as a basement outer side wall to play a permanent retaining role, but also can ensure the backfill operation of a retaining area and the construction of other structures of the backfill area while ensuring the normal construction of the basement, and does not need to construct a basement side wall and a retaining structure at the same time, so that the construction period is shortened, and the construction cost is reduced. And the construction cost is also saved.
Owner:MCC CAPITAL ENGINEERING & RESEARCH INC LTD

Method for selecting form of retaining structure in complex and harsh environment

The invention relates to the technical field of retaining engineering, geotechnical engineering and ground disaster prevention and control, in particular to a complex and harsh environment retaining structure form selection method. Comprising the following steps: acquiring risk factors causing disasters of the retaining structure; sorting risk factors causing disasters of the retaining structure; judging the disaster occurrence probability grade of the retaining structure; judging the grade of the disaster occurrence consequence of the retaining structure; judging the risk level of the disaster of the retaining structure; and judging the form of the retaining structure according to the risk level of the disaster of the retaining structure. According to the complex and harsh environment retaining structure form selection method, the complex and harsh environment retaining structure form is scientifically and reasonably selected on the basis of risk factors causing retaining structure disasters, the retaining structure disaster occurrence probability level and the retaining structure disaster occurrence consequence level, implementation is convenient and fast, the process is clear, and the method is suitable for large-scale popularization and application. Normal construction and operation of a project are guaranteed, and actual project requirements can be met.
Owner:CHINA RAILWAY ERYUAN ENGINEERING GROUP CO LTD

A method for physiological health monitoring and environmental monitoring early warning of deep foundation pit construction workers

The present invention discloses a physiological health monitoring and environmental monitoring early warning method for deep foundation pit construction workers, the method comprising: obtaining historical physiological index information, historical air index data and historical foundation pit enclosure structure data, and pre-processing the historical physiological index information according to preset requirements to obtain historical physiological parameter data; performing data processing on the historical physiological parameter data according to the factor analysis method to obtain the overall physiological health index of the construction personnel; performing linear analysis processing on the historical air index data according to the overall physiological health index to obtain the target threshold range of the historical air index data; obtaining the current physiological parameter data and the current environmental data, if the current physiological parameter data is judged to be abnormal according to the preset requirements or the current environmental data is judged to be abnormal according to the target threshold range, a safety alarm prompt is given. The present invention effectively ensures the normal construction of the deep foundation pit and the personal safety of the construction personnel.
Owner:SHENZHEN UNIV

A collaborative construction method for an internal steel frame and an external precast concrete shear wall structure

The present invention discloses a method for collaborative construction of an inner steel frame and an outer precast concrete shear wall structure, comprising the following construction steps: S1, structural component splitting design; splitting the inner steel frame and the outer precast concrete shear wall structure, vertically splitting the steel structure into vertical column segments, each vertical column segment corresponding to two floors of the building; S2, installing and calibrating the vertical column segments of the inner steel frame according to one column and two layers vertically; S3, installing the Nth layer of outer precast concrete shear wall; S4, installing the steel beam connecting the inner steel frame and the Nth layer of outer precast concrete shear wall; S5, installing the N+1th layer of composite floor slab; S6, pouring concrete for the Nth layer of outer precast shear wall and the N+1th layer of composite floor slab. The above construction method can effectively achieve the fault tolerance compensation of high installation precision of steel structure and low installation precision of outer precast concrete shear wall, and finally ensure the construction quality of the inner steel frame and the outer precast concrete shear wall structure, and speed up the construction speed.
Owner:BEIJING HOUSING INDUSTRIALIZATION GRP CO LTD

Foundation pit assembly, dewatering well and intelligent dewatering system thereof

The utility model discloses a foundation pit assembly, a dewatering well and an intelligent dewatering system of the dewatering well, and the intelligent dewatering system comprises a water outlet pipe which is used for extending into the dewatering well; the water pumping driving device is communicated with the water outlet pipe and is used for discharging water in the dewatering well out of the dewatering well through the water outlet pipe; and the power adjusting device is connected with the water pumping driving device, and the power adjusting device can adjust the power of the water pumping driving device according to the height of the water level in the dewatering well. The power adjusting device is additionally arranged and used for adjusting the power of the water pumping driving device according to the water pressure condition in the dewatering well, so that the power of the water pumping driving device is matched with the water pressure, the power of the water pumping driving device is adjusted in real time according to the water level, and the water pumping rate is adjusted in real time; water accumulation in the dewatering well is prevented, and normal construction is guaranteed.
Owner:BEIJING FOREVER TECH

Self-disassembly equipment for construction template trolley in tunnel

The self-disassembly device for the template trolley for construction in the tunnel of the present invention is composed of a lifting system, a moving system and a sliding system arranged on the template trolley. It overcomes the defects of the current disassembly method of the template trolley in the tunnel, can ensure the normal construction of the template trolley as scheduled, and can be disassembled in time after the construction is completed. The disassembly is flexible and convenient, the use is safe and reliable, and does not affect the subsequent construction. It reduces air pollution in the tunnel, is energy-saving and environmentally friendly, has a simple structure, low construction cost, high work efficiency, and strong practicality. It is indeed an ideal self-disassembly device for the template trolley for construction in the tunnel.
Owner:中铁二十一局集团第三工程有限公司

Special bored pile drilling machine for road and bridge construction

The present invention discloses a bored pile drilling machine for road and bridge construction. The rotating plate can be placed horizontally above the fixed frame, and can also be turned 90 degrees and placed vertically outside the fixed frame. The right side of the rotating plate is equipped with a slide plate, a first motor, a support plate, a conveying auger, a first motor, and a limit cylinder. A soil outlet is provided on the upper side wall of the limit cylinder. The gap of the lower outer wall of the limit cylinder is provided with an orifice positioning baffle assembly. The lower end of the conveying auger extends outside the limit cylinder, and a drill bit is fixedly connected to the bottom end of the conveying auger. When the moving ring descends to the lowest position, all the arc plates and the alloy blades are just assembled into a complete panel. When the moving ring rises to the highest position, all the arc plates are separated from the alloy blades, so that a gap for soil to pass through is formed between the arc plates and the alloy blades. The drilling machine solves the problem that the drill bit of the common drilling machine is tilted due to unbalanced force, which affects the construction and there are a lot of impurities at the bottom when the drill bit is taken out, which affects the performance of the filling column.
Owner:SUZHOU IND PARK CIVICISM COMMUNAL ENG CONSTR CO LTD +1

Pipe jacking engineering water gushing construction method

ActiveCN116676974BAvoid water leakageavoid safety hazards
The application discloses a pipe jacking engineering water gushing construction method, relates to the pipe jacking engineering water gushing construction technical field, and comprises the following steps: S1, surface grouting; S2, water pumping method; S3, hole portal water stop reinforcement; S4, hole opening section anti-pipeline upwarp measure; S5, in-pipe maintenance; S6, wall back grouting; S7, slurry replacement requirement and S8, measurement and deviation rectification construction steps. The pipe jacking engineering water gushing construction method can be favorable for reducing and avoiding pipeline water seepage, thereby guaranteeing normal construction, preventing economic losses and personnel safety hazards caused by equipment flooding, and guaranteeing normal engineering progress.
Owner:SHENZHEN MUNICIPAL ENG CORP

Cooperative construction method for inner steel frame and outer prefabricated concrete shear wall structure

The invention discloses a cooperative construction method for an inner steel frame and an outer prefabricated concrete shear wall structure. The cooperative construction method comprises the following construction steps that S1, structural components are designed in a split mode; the inner steel frame and the outer prefabricated concrete shear wall structure are designed in a split mode, the steel structure is vertically split into vertical column sections, and each vertical column section corresponds to two floors of a building; s2, vertical column sections of the inner steel frame are installed and corrected according to the mode that one column and two layers are arranged in the vertical direction; s3, the Nth layer of outer prefabricated concrete shear wall is installed; s4, connecting steel beams of the inner steel frame and the Nth layer of outer prefabricated concrete shear wall are installed; s5, mounting the (N + 1) th layer of composite floor slab; and S6, concrete is poured into the Nth layer of outer prefabricated shear wall and the (N + 1) th layer of composite floor slab. According to the construction method, fault-tolerant compensation of high mounting precision of the steel structure and low mounting precision of the outer prefabricated concrete shear wall can be effectively achieved, finally, the construction quality of the inner steel frame and the outer prefabricated concrete shear wall structure is guaranteed, and the construction speed is increased.
Owner:BEIJING HOUSING INDUSTRIALIZATION GRP CO LTD