Unlock instant, AI-driven research and patent intelligence for your innovation.

Power grid project management intelligent system architecture and method

A project management and intelligent system technology, applied in the field of power grid project management intelligent system architecture, can solve problems such as the lack of a unified support platform for common services, the inability to cope with the competition pattern, and the chaotic relationship between equipment and equipment

Pending Publication Date: 2021-11-26
STATE GRID CORP OF CHINA +3
View PDF0 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] At present, the project of State Grid Corporation adopts the matrix management mode of "comprehensive plan + special plan". In terms of project management informationization, the comprehensive plan management information system is mainly used, and the special plan management system is supplemented. The project is carried out in the ERP system Execution, multiple systems running in parallel at each stage of project management, data correlation and interaction, lack of unified data source, lack of unified and standardized information standards, the number of projects in the planning and planning system is inconsistent with the number of projects in the lean management system of equipment operation and maintenance, and equipment generated by planning projects Problems such as chaotic relationship with the equipment of the equipment operation and maintenance lean management system; lack of a unified support platform for common services, the same business is processed across systems, there is a phenomenon that the same business is operated back and forth in multiple systems, data is transmitted back and forth, and it is difficult to cross-professional review ; The IT architecture of the existing unified promotion system and self-built system is mainly "chimney-style", forming resource "islands" and information "islands". There are many chimneys in various professional systems, and there are data barriers. Decision makers cannot obtain the information needed for project decision-making. Real-time data such as equipment, facilities and production operations cannot cope with the fierce competition in the market
At the same time, the full-service data center has not been fully and uniformly implemented, and it is difficult to guarantee the consistency and rigor of the source data of project management

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power grid project management intelligent system architecture and method
  • Power grid project management intelligent system architecture and method
  • Power grid project management intelligent system architecture and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment approach

[0053] like figure 1 As shown, the present invention provides an intelligent system architecture for power grid project management, including a heterogeneous cloud platform 1 , a data middle platform 2 , a project management middle platform 3 , a multi-modal application platform 4 and an operation guarantee platform 5 . The project management center 3 accesses the data assets of the data center according to the obtained project information, analyzes and processes the data assets according to the business requirements and technical requirements of the project management; packages the processed data into a set of business microservices , data microservices and message processing microservices are provided to users;

[0054] The multi-modal application platform 4 is used for performing multi-modal visualization applications on the client side.

[0055] The operation guarantee platform 5 is used to guarantee the system operation under the security framework.

[0056] In this exa...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a power grid project management intelligent system architecture and method. The power grid project management intelligent system architecture comprises a heterogeneous cloud platform, a data middle platform, a project management middle platform and a polymorphic application platform. The heterogeneous cloud platform provides infrastructure; the data middle platform is used for storing data assets according to forms of a block chain, a distributed database and a data warehouse; the project management middle station accesses data assets of the data middle station according to the acquired project information, and analyzes and processes the data assets according to business requirements and technical requirements of project management; and the processed data is packaged into a group of business micro-services, data micro-services and message processing micro-services, and the service micro-services, the data micro-services and the message processing micro-services are provided to a user for polymorphic applications. According to the invention, the collaborative management efficiency is improved, the intelligent management level of a project is improved, and a power grid enterprise is promoted to be converted from process driving to data driving.

Description

technical field [0001] The invention belongs to the technical field of cloud computing operations, and relates to a management framework for power grid enterprise projects, in particular to a grid project management intelligent system architecture and method. Background technique [0002] Project management is an effective means for enterprises to enhance strategic execution, improve management leanness, and enhance resource allocation capabilities. [0003] At present, the project of State Grid Corporation adopts the matrix management mode of "comprehensive plan + special plan". In terms of project management informationization, the comprehensive plan management information system is the mainstay, supplemented by the special plan management system, and the project is carried out in the ERP system. Execution, multiple systems running in parallel at each stage of project management, data correlation and interaction, lack of unified data source, lack of unified and standardize...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/10G06Q50/06G06F16/182
CPCG06Q10/103G06Q50/06G06F16/182Y04S10/50
Inventor 沙宇恒李文龙邓春宇刘玉方龙昌敏梅鑫陈文静李雯芸张艳来黄翔李俊辉朱紫伟李露露
Owner STATE GRID CORP OF CHINA