Method for predicting transformer substation load by applying public information of power market
A technology for disclosing information and electricity market, applied in the field of substations, can solve problems such as no calculation method, and achieve the effect of simple method, reasonable design and high reliability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0045] Embodiments of the present invention will be described in further detail below in conjunction with the accompanying drawings.
[0046] In the present invention, the power system refers to the power system on which the power market relies, generally (not limited to) the provincial power system, and the partition refers to the sub-power system in the power system, generally (not limited to) the municipal power system system. A power system consists of several partitions.
[0047] In this embodiment, every day is divided into 96 time periods; the historical load days of each partition and each substation are three days, that is, n=3; the power system has three partitions, namely, partition 1, partition 2 and partition 3; The partition contains several substations. In this embodiment, only a certain substation in each partition is counted, that is, substation 1 (belonging to partition 1), substation 2 (belonging to partition 2) and substation 3 (belonging to partition 3). ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


