Three-stage series internal and external ice melting ultralow-temperature cooling equipment and using method
A three-stage series, ultra-low temperature technology, used in mechanical equipment, lighting and heating equipment, applications, etc., can solve the problems of low efficiency of chilled water supply and cooling, and can not achieve internal ice melting, achieve fast ice melting and improve refrigeration. Efficiency, the effect of reducing operating energy consumption and cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] Such as figure 1 As shown, the present embodiment provides a three-stage series-connected internal and external ice-melting ultra-low temperature cooling equipment, including a chilled water circulation system, a base load refrigeration system, a dual-working mode refrigeration system, and an ice-melting system; the chilled water circulation system includes a water collector 1 , the water separator 4 and the chilled water circulation pump 5 arranged between the water collector 1 and the water separator 4; the water collector 1, the chilled water circulation pump 5 and the water separator 4 pass through The chilled water circulation pipeline is connected; the inlet end and the outlet end of the base load refrigeration system are connected with the chilled water circulation pipeline through the base load pipeline; the dual-working mode refrigeration system includes a main plate heat exchanger 6, a duplex condition host machine 9 and solution pump 8; the main plate heat ex...
Embodiment 2
[0049] This embodiment provides a method for using the ultra-low temperature cooling equipment based on the three-stage series-connected internal and external ice melting in Embodiment 1, including the following working conditions:
[0050] In the first working condition, the dual-working-condition main engine 9 makes ice, the dual-working-condition main engine 9, the ice storage device 10, and the solution pump 8 are in the running state, the second valve V2 and the third valve V3 are opened, and the base-load main engine 3 and the main engine board are replaced. Heater 6, ice-melting plate heat exchanger 7, ice-melting pump 11, base load chilled water pump 2, and chilled water circulation pump are out of service, the first valve V1, the fourth valve V4, the fifth valve V5, the sixth valve V6, the The seventh valve V7, the eighth valve V8 and the ninth valve V9 are closed;
[0051] In the second working condition, the dual-working-condition main engine 9 makes ice and supplie...