A Synchronous Follow-Up Construction Method of Steel Pipe Sheets Suitable for Shaft Excavation

A construction method and technology of steel pipe segments, which can be used in shaft equipment, sinking, earthwork drilling, etc., and can solve problems such as high difficulty, complicated procedures, and low bearing capacity of shaft segments

Active Publication Date: 2022-02-11
CHINA RAILWAY CONSTR HEAVY IND
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0009] Support link: when using segments for support in the prior art, prefabricated concrete segments or prefabricated steel pipe segments are generally used, and the segments are connected by bolts, which causes the shaft segments to The bearing capacity of the direction is low, and the overall strength of the wellbore is limited after forming, which cannot meet the high-strength shaft construction requirements
At the same time, there are gaps between the segments, and there is a risk of seal leakage in the later stage
Using welding method as the segment connection method can improve the overall strength of the wellbore and improve the leakage prevention ability, but it takes a lot of time to use the welding method between the segments, and the welding operation needs to be carried out in the underground environment, which is extremely difficult
[0010] Pouring link: The drill and blast method usually uses the synovial film pouring method to pour the shaft wall in sections. After the overall excavation of the shaft is completed, the formwork system is lowered, and the concrete is poured between the formwork and the well wall to complete the layer-by-layer and segmented pouring. Therefore, it cannot be poured at one time. It takes a long time to complete the overall pouring; the drilling rig method needs to assemble the segments ring by ring from the bottom and arrange the water-resistant layer after the excavation construction is completed. After the assembly is completed, spray mix between the cave wall and the segment. Complicated; the raised well method and the reaming method have requirements on the construction geology, and generally require better construction geological conditions. At present, there are few construction cases in China

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A Synchronous Follow-Up Construction Method of Steel Pipe Sheets Suitable for Shaft Excavation
  • A Synchronous Follow-Up Construction Method of Steel Pipe Sheets Suitable for Shaft Excavation
  • A Synchronous Follow-Up Construction Method of Steel Pipe Sheets Suitable for Shaft Excavation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0049] see Figure 1-Figure 4 , a steel pipe sheet synchronous follow-up construction method suitable for shaft excavation, specifically includes the following steps (see figure 1 ):

[0050] The first step is to design the lock structure of the construction location and carry out the lock construction.

[0051] In this embodiment, according to the evaluation of the shaft excavation equipment, the weight of the shaft and the bearing weight of the supporting auxiliary construction equipment to provide guarantee for the subsequent construction, the lock structure is designed according to the actual situation of the project, and the shaft is excavated in the preset construction area (ground 1). Build the lock, and after the lock structure is formed, install excavation equipment, hoisting and leveling equipment and other construction equipment and carry out debugging. It is preferred here: the locking structure is an asymmetric structure or a symmetrical structure, see image 3...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a synchronous follow-up construction method of steel pipe sheets suitable for shaft excavation, including: designing the lock structure of the construction position and performing lock construction; using excavation equipment to dig the depth of a layer of steel pipe sheets; forming the first layer of After at least two steel pipe sheets of the steel pipe ring are hoisted to the predetermined position of the excavation equipment, the weld seams between adjacent steel pipe sheets are welded to form a steel pipe ring, and the gap between the steel pipe sheets and the shield body is welded to make the first layer The steel pipe ring is fixed on the shield body; the steel pipe sheets are welded and assembled until the excavation equipment is excavated until completion; the shield body is reserved and the excavation equipment is withdrawn, and the shaft shaft structure is obtained by pouring. Applying the construction method of the present invention, the steel pipe sheet is used to follow up the construction of the shaft excavation synchronously, and the support effect can be quickly formed on the well wall in soft ground or rock formation, and the overall welding strength of the steel pipe sheet is high, which is suitable for various strata. Excavation, with the adaptability of soft soil / rock excavation construction.

Description

technical field [0001] The invention relates to the technical field of shaft construction, in particular to a synchronous follow-up construction method for steel pipe sheets suitable for shaft excavation. Background technique [0002] The shaft is the shortest passage connecting the ground to the underground space, and it is an important underground engineering facility, which is widely used in many fields such as hydraulic power, mining, municipal administration, and national defense. [0003] Existing shaft construction technologies include drill and blast method, drilling rig method, raised shaft method, reaming method, etc. The advantages and disadvantages of the technologies are analyzed as follows: [0004] Drilling and blasting method: The drilling and blasting method is a commonly used shaft construction method at present. The drilling equipment is used to drill holes on the excavation surface of the shaft, and then explosives are installed in the holes for blasting....

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D1/03E21D5/11
CPCE21D1/03E21D5/11
Inventor 刘飞香刘在政文中保李政姚满任庆成丁张飞苏翠侠谢铮王巍峰
Owner CHINA RAILWAY CONSTR HEAVY IND