A Synchronous Follow-Up Construction Method of Steel Pipe Sheets Suitable for Shaft Excavation
A construction method and technology of steel pipe segments, which can be used in shaft equipment, sinking, earthwork drilling, etc., and can solve problems such as high difficulty, complicated procedures, and low bearing capacity of shaft segments
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0049] see Figure 1-Figure 4 , a steel pipe sheet synchronous follow-up construction method suitable for shaft excavation, specifically includes the following steps (see figure 1 ):
[0050] The first step is to design the lock structure of the construction location and carry out the lock construction.
[0051] In this embodiment, according to the evaluation of the shaft excavation equipment, the weight of the shaft and the bearing weight of the supporting auxiliary construction equipment to provide guarantee for the subsequent construction, the lock structure is designed according to the actual situation of the project, and the shaft is excavated in the preset construction area (ground 1). Build the lock, and after the lock structure is formed, install excavation equipment, hoisting and leveling equipment and other construction equipment and carry out debugging. It is preferred here: the locking structure is an asymmetric structure or a symmetrical structure, see image 3...