Use the road to prepare renewable materials and the preparation methods and applications
A road and binding material technology is applied in the field of road quick repairing consolidated material and its preparation, which can solve the problems of increasing the difficulty of utilization and high processing cost, and achieve the effects of easy large-scale implementation, environmental protection of products, and controllable construction technology.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0096] Example 1 (Resin A, cement pavement repair)
[0097] This configuration of road quick repairing consolidation material can be used for cement road pavement repair. Before configuring the road quick repairing consolidation material, first configure graded aggregate and color matching filler, and fine-tune the color matching filler to carry out the color and particle size of the cement road on-site pavement. match.
[0098] A raw material ratio for preparing road quick repairing consolidation material by using recycled materials is (unit / kg):
[0099] Graded Aggregate 500, which includes:
[0100]
[0101]
[0102] Color matching filler 150, including:
[0103]
[0104] Initiator 2.0, which includes:
[0105]
[0106] The regenerated reinforcing fiber is prepared by tearing, pulverizing and sieving the FRP composite material, generally 80-8 mesh, preferably 60-20 mesh.
[0107] The preparation process includes the following steps:
[0108] (1) Accurately ...
Embodiment 2
[0112] Example 2 (Resin B, Asphalt Pavement Repair)
[0113] This configuration of road quick repairing consolidation material can be used for asphalt road pavement repair. Before configuring the road quick repairing consolidation material, first configure graded aggregate and color matching filler, and fine-tune the color matching filler to carry out the color and particle of asphalt road on-site pavement. degree match.
[0114] A raw material ratio for preparing road quick repairing consolidation material by using recycled materials is (unit / kg):
[0115] Graded Aggregate 500, which includes:
[0116]
[0117] Color Filler 100, which includes:
[0118]
[0119] Initiator 3.5, which includes:
[0120]
[0121] The preparation process includes the following steps:
[0122] (1) Accurately weigh the environmentally friendly recycled resin B according to the formula, and stir and disperse the flame retardant, accelerator and plasticizer into the resin, disperse with ...
Embodiment 3
[0126] Example 3 (Resin C, water stabilization layer repair)
[0127] This configuration of road quick repair consolidation material can be used to repair the subgrade (water stable layer) of cement road or asphalt road, and there is no color matching requirement for subgrade repair.
[0128] A raw material ratio for preparing road quick repairing consolidation material by using recycled materials is (unit / kg):
[0129] Graded Aggregate 500, which includes:
[0130]
[0131]
[0132] The preparation process includes the following steps:
[0133] (1) Accurately weigh the environmentally friendly recycled resin C according to the formula, stir and disperse the accelerator into the resin, disperse it with a dissolving and dispersing paddle for about 2-3 minutes, add the accelerator and disperse for 2-3 minutes, and disperse it uniformly for later use.
[0134] (2) Add graded aggregate, color matching filler, bluestone, regenerated fiber, etc. into the artificial stone mix...
PUM
| Property | Measurement | Unit |
|---|---|---|
| viscosity | aaaaa | aaaaa |
| acid value | aaaaa | aaaaa |
| particle size (mesh) | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 


