Method for calculating axial force distribution of core soil full-length bonding type counter-pulling anchor rod

It is a technology of pulling anchor rods and calculation methods, which is applied in complex mathematical operations, design optimization/simulation, special data processing applications, etc., and can solve problems such as unclear longitudinal force distribution laws of rods

Pending Publication Date: 2022-01-14
CHINA TIESIJU CIVIL ENG GRP CO LTD
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] However, the mechanical properties of the full-length bonded anti-tension anchor, especially the distribution of the axial force along the longitudinal length of the rod body, are not yet clear. Distinguish the grout anchors, and consider the excavation sequence of the side pilot tunnels, and design an analysis method for the axial force of the full-length bonded opposite tension anchors

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for calculating axial force distribution of core soil full-length bonding type counter-pulling anchor rod
  • Method for calculating axial force distribution of core soil full-length bonding type counter-pulling anchor rod
  • Method for calculating axial force distribution of core soil full-length bonding type counter-pulling anchor rod

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0069] A preferred embodiment of the present invention will be described in detail below in conjunction with the accompanying drawings.

[0070] Such as figure 1The schematic diagram of the double-side wall method core soil full-length bonded anchor rod is shown. The long-span tunnel is excavated by the double-side wall method. The left pilot tunnel 1 is excavated first, and the right pilot tunnel 2 is excavated later. The core soil 3 is left for final excavation; the full-length bonded double anchor 4 is used to support the core soil 5, and the double anchor runs through the core soil, including the rod body and the anchor pads arranged inside the left and right pilot holes. The prestress P is applied to the end; the material of the tension anchor rod is HRB335 steel bar, and its yield elongation rate can reach 18%; after the pilot tunnel is excavated, the initial support concrete 6 is applied, so that the long-bonded tension anchor exists The two kinds of anchor layer media...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a method for calculating axial force distribution of a core soil full-length bonding type counter-pulling anchor rod, which comprises the following steps of: carrying out stress analysis on an anchor rod stress micro-unit to obtain a corresponding anchoring body control differential equation and an axial force analytic expression; according to the anchoring body control differential equation and the axial force analytic expression of the stress micro-unit, establishing a full-length bonding type opposite-pulling anchor rod mechanical model according to the situation that deformation at the segmented position of the stress micro-unit is continuous and shear stress and shear displacement are in a linear elastic relation; and according to a mechanical model, substituting the stratum and anchor rod parameters, and calculating the axial force of the full-length bonding type opposite-pulling anchor rod. The core soil full-length bonding type opposite-pulling anchor rod mechanical model is provided which satisfies the actual working state of the opposite-pulling anchor rod, considers the influence of the double-sidewall method side pilot tunnel excavation sequence, is used for predicting the axial force of the opposite-pulling anchor rod at a certain position, provides a reference for design and construction of the opposite-pulling anchor rod, can further obtain distribution curve of the axial force of the full-length bonding type opposite-pulling anchor rod along the full length of the rod body, and can obtain the axial force distribution curve only by inputting simple geological exploration parameters.

Description

technical field [0001] The invention relates to the technical field of geotechnical engineering measurement and calculation, in particular to a calculation method for axial force distribution of a core-soil through-length bonded tension anchor rod. Background technique [0002] The double-side wall method is an excavation method applied to long-span tunnels in weak rock formations. It refers to dividing the long-span tunnel into three small-span sections, excavating the left and right pilot pits in sequence, and finally excavating and reserving the core soil; In specific construction, the excavation of the left and right side pilot tunnels will cause severe disturbance to the core soil, making the core soil in a one-way or two-way unfavorable stress state; Therefore, the core of the double-side wall method is to ensure the stability and firmness of the reserved core soil. In order to ensure the safe construction of long-span tunnels with the double-side wall method, the cor...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06F30/20G06F17/13G06F119/14
CPCG06F30/20G06F17/13G06F2119/14
Inventor 李然王圣涛申志军潘红桂艾鹏鹏关渭南程贤红方伏浪张伟徐洪强刘向阳李奥罗基伟
Owner CHINA TIESIJU CIVIL ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products