An early warning system and slope technology, applied in infrastructure engineering, alarm, height/horizontal measurement, etc., can solve the problem that it is difficult for slope engineering managers to calculate the coordination of slope engineering excavation and support

Active Publication Date: 2022-01-14
POWERCHINA CHENGDU ENG
View PDF14 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The technical problem solved by the present invention is to provide a progress monitoring and early warning system for slope engineering, which solves the problem that it is difficult for slope engineering managers to calculate the coordination of excavation and support in the construction process of slope engineering

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Progress monitoring and early warning system for slope engineering

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0016] The progress monitoring and early warning system of the slope project of the present invention is as attached figure 1 As shown, it includes a data input module, an arithmetic module and a monitoring and early warning module;

[0017] The data input module is used to input the elevations of each level of the slope, the excavation time of each level, the excavation completion time of each level, the completion time of each process of shallow support in the excavated elevation and the completion time of each level. The completion time of each process of the middle and deep support in the elevation that has been excavated;

[0018] Specifically, the slope engineering is classified according to the elevation, for example, every 30 meters is a level, and each level of elevation includes excavation, shallow support and deep support; each process of shallow support includes: Anchor rods, sprayed concrete, hanging nets and drainage holes; deep support procedures include drilli...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical field of slope engineering, and especially relates to a progress monitoring and early warning system for slope engineering. The slope engineering is divided into multiple levels according to elevations, the lowest elevation, the maximum elevation difference of shallow support and the maximum elevation difference of deep support of completed procedures in each level of elevation are calculated through an operation module on the basis of each level of elevation, the coordination of excavation and support is embodied through the maximum elevation difference of shallow support and the maximum elevation difference of deep support, and an early warning module gives out early warning when the maximum elevation difference of shallow support exceeds a first threshold value and gives out early warning when the maximum elevation difference of deep support exceeds a second threshold value. A slope engineering manager can judge whether excavation and supporting are not coordinated in the slope engineering or not according to the early warning, so that the problem that the slope engineering manager is difficult to count the coordination of excavation and supporting in the slope engineering construction process is solved, and the slope engineering management method is suitable for slope engineering management.

Description

technical field [0001] The invention relates to the technical field of side slope engineering, in particular to a progress monitoring and early warning system for side slope engineering. Background technique [0002] In the construction process from high to low of high slope engineering of hydropower engineering, there are many procedures, including excavation, shallow support and deep support. The procedures of shallow support include bolts, shotcrete, hanging net and Drainage holes, etc., the deep support is such as an anchor cable. The procedures of the anchor cable include drilling, threading, grouting, pouring anchor piers and tensioning. During the implementation process, according to construction specifications and technical requirements, excavation, There are specific requirements for the timeliness of shallow support and deep support, but the support is often disconnected in progress, that is, the support progress lags behind the excavation. If the lag range is too ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G08B21/18E02D17/20G01C5/00
CPCG08B21/182E02D17/20G01C5/00Y02A10/23
Inventor 刘小强张敬张冲潘燕芳
Owner POWERCHINA CHENGDU ENG
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More