Monitoring method for building bridge construction

A technology for bridge construction and construction, applied in the field of monitoring for construction and bridge construction, can solve the problems of poor monitoring accuracy, lack of monitoring and analysis of building bridges, etc., and achieve the effect of improving accuracy

Active Publication Date: 2022-02-11
GUANGXI UNIVERSITY OF TECHNOLOGY +1
View PDF9 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to provide a monitoring method for building bridge construction, which solves the following technical problems: how to solve the problem of monitoring and analyzing the construction of building bridges based on the environment and materials in the existing solutions, resulting in poor monitoring accuracy technical issues

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Monitoring method for building bridge construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

[0033] see figure 1 Shown, the present invention is a kind of building bridge construction monitoring method, and concrete steps comprise:

[0034] Obtain environmental information and material information of bridge construction, the environmental information includes water body data and geological data, and the material information includes cement data, concrete data and pouring data;

[0035] Perform value marking and statistics on various data in the environmen...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a monitoring method for building bridge construction. The monitoring method comprises the following steps: acquiring environment information and material information of bridge construction; carrying out value marking and statistics on various data in the environment information to obtain first processing information; carrying out value marking and statistics on various data in the material information to obtain second processing information; performing matching calculation on the first processing information and the second processing information through a pre-constructed bridge construction model to obtain an environment training value and a construction training value; carrying out a simultaneous operation on the environment training value and the construction training value to obtain construction monitoring values; analyzing the construction monitoring values to obtain a construction monitoring set. According to the invention, the technical problem that, in a scheme in the prior art, monitoring and analysis are not carried out on the construction of a building bridge based on an environmental aspect and a material aspect at the same time, and consequently monitoring accuracy is poor, is solved.

Description

technical field [0001] The invention relates to the technical field of building bridge construction, in particular to a monitoring method for building bridge construction. Background technique [0002] Bridge construction refers to the process of building bridges according to the design content; it mainly refers to bridge construction technology and construction organization, construction management, and construction quality. As an important part of the bridge, the pier column has a profound impact on the overall stability of the bridge due to its appearance design and quality management. To strengthen the construction quality management of bridge piers and columns, we should start from the management of raw materials, construction personnel and construction technology, and formulate corresponding solutions for pitting, air bubbles, honeycombs, and watermarks, so as to ensure the quality of bridge piers and columns. The appearance meets the basic requirements. [0003] The...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/08
CPCG06Q10/06395G06Q50/08Y02A20/152
Inventor 黄世斌梁鑫陈进良吴宇鸿黄忠翔何柏灵黄镇谨
Owner GUANGXI UNIVERSITY OF TECHNOLOGY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products