Task scheduling method and device, equipment, and storage medium
A task scheduling and task technology, applied in the computer field, can solve problems such as single function, lack of scheduling task execution optimization, etc., to achieve the effect of improving utilization rate, execution optimization, and improving rationality and accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] figure 1 It is a flow chart of the task scheduling method in Embodiment 1 of the present invention, and this embodiment is applicable to the case where the task scheduling system executes the scheduling tasks. The method can be executed by a task scheduling device, which can be implemented in software and / or hardware, and can be configured in a device. For example, the device can be a background server and other devices with communication and computing capabilities. like figure 1 As shown, the method specifically includes:
[0026] Step 101. Obtain the operating value of the monitoring parameter during the execution of the scheduling task; wherein, the scheduling task is executed using the assigned value of the monitoring parameter, and the assigned value of the monitoring parameter is determined according to the matching assigned value of the preset parameter to be optimized.
[0027] Wherein, the scheduling task refers to the task being processed by the task schedul...
Embodiment 2
[0061] figure 2 It is a flowchart of the task scheduling method in the second embodiment of the present invention, and the second embodiment is further optimized on the basis of the first embodiment. like figure 2 As shown, the method includes:
[0062] Step 201 , acquire the running time of at least two scheduled tasks.
[0063] Since the same scheduling task will record each running situation in the analysis database when it is executed, including the running time, the task scheduling system can perform a secondary analysis on the scheduling task after multiple executions to ensure that the scheduling task The precision with which the assigned value is determined.
[0064] Exemplarily, the running status of the scheduled task is acquired periodically, and if the running status is at least twice, then the running time-consuming records of at least two times are acquired. Or when the running times of the scheduled task exceeds the threshold, multiple running time-consumi...
Embodiment 3
[0091] image 3 It is a schematic structural diagram of the task scheduling device in Embodiment 3 of the present invention, and the task scheduling system in this embodiment executes the scheduling tasks. like image 3 As shown, the device includes:
[0092] The operating value determination module 310 is used to obtain the operating value of the monitoring parameter during the execution of the dispatching task; wherein, the dispatching task is executed using the assigned value of the monitoring parameter, and the assigned value of the monitoring parameter is based on the matched pre-set to-be-optimized The assigned value of the parameter is determined;
[0093] An optimization value determination module 320, configured to determine the optimal value of the parameter to be optimized based on the comparison result between the operating value of the monitoring parameter and the assigned value of the monitoring parameter;
[0094] The allocation value determination module 330...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com