Handrail maintenance painting device
A technology for painting devices and railings, which is applied to devices for coating liquid on surfaces, transportation and packaging, mixers, etc., can solve problems such as manual painting of railings, and achieve the effects of reducing waste and facilitating adjustment.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] like Figure 1-Figure 2 As shown, a railing maintenance painting device includes a car body 1, a painting device and a painting device are arranged on the car body 1, the painting device includes a paint box 2 and a return box 3, and the paint box 2 is provided with a paint port , the reflux tank 3 is arranged below the paint tank 2, a pump 4 is arranged between the reflux tank 3 and the paint tank 2, the painting device is arranged between the paint tank 2 and the reflux tank 3, and the painting device includes a first propulsion device 5 and a brush plate 6, the brush plate 6 is arranged below the paint port, the upper end of the reflow box 3 is provided with a return port, and the return port is arranged under the brush plate 6.
[0038] Specifically, the car body 1 is a vehicle, and the car body 1 exists as a carrier. A box body with one side opening is installed on the car body 1. The painting device and the painting device are all installed in the box body. The pa...
Embodiment 2
[0042] like image 3 and Figure 4 As shown, the structure of this embodiment is roughly the same as that of Embodiment 1, and this embodiment is further optimized on the basis of Embodiment 1: the brush plate 6 includes bristles 7, elastic cloth 8, cavity 9 and a second propulsion device, and the bristles 7 Evenly arranged on the elastic cloth 8, one end of the cavity 9 is fixedly connected to the propulsion device, the end of the cavity 9 away from the first propulsion device 5 is provided with an opening, and the elastic cloth 8 is arranged on the end of the cavity 9 away from the first propulsion device 5 , the second propulsion device is arranged in the cavity 9, and one end of the second propulsion device abuts against the elastic cloth 8.
[0043] Specifically, the brush plate 6 includes bristles 7, elastic cloth 8, a cavity 9 and a second propulsion device, the cavity 9 is vertically arranged between the paint tank 2 and the return tank 3, and one end of the cavity 9 ...
Embodiment 3
[0049] like Figure 5 As shown, the structure of this embodiment is roughly the same as that of Embodiment 2, and this embodiment is further optimized on the basis of Embodiment 2: a receiving plate 15 is provided under the side of the bristles 7 away from the elastic cloth 8, and one end of the receiving plate 15 is located at the back flow Set above the port and slope downward towards the return port.
[0050] Specifically, a receiving plate 15 is installed below the side of the bristles 7 away from the elastic cloth 8. One end of the receiving plate 15 is located above the return port and tilts downward toward the return port. Collect the paint to prevent the paint from polluting other locations.
[0051] As a further optimization of the present invention: an upper plate is arranged above the bristle 7 away from the side of the elastic cloth 8, and a paint pouring device is arranged on the upper plate, and the paint pouring device includes a paint pipe 16 and a valve, and ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


