Integral type steel formwork leaking stoppage device in foundation pit and construction method
A construction method and an integrated technology, which is applied in the direction of infrastructure engineering, excavation, and foundation structure repair, etc., can solve problems such as high cost and poor effect, achieve equipment cost saving, reliable and stable sealing effect, and reduce construction cost and the effect of the time required for construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0035] In order to make the above objects, features and advantages of the present invention more comprehensible, specific implementations of the present invention will be described in detail below in conjunction with the accompanying drawings. In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. However, the present invention can be implemented in many other ways different from those described here, and those skilled in the art can make similar improvements without departing from the connotation of the present invention, so the present invention is not limited by the specific embodiments disclosed below. The technical features in the various embodiments of the present invention can be combined accordingly on the premise that there is no mutual conflict.
[0036] In the description of the present invention, it will be understood that when an element is referred to as being "connected" or "fi...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


