Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Decision-making method for determining bridge maintenance sequence

A decision-making method and bridge technology, applied in data processing applications, instruments, forecasting, etc., can solve problems such as unfavorable wide application and explosive increase in calculation amount, and achieve the effect of accurate sorting and wide application

Active Publication Date: 2022-05-31
北京新桥技术发展有限公司
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0009] 1. In the decision-making of bridge maintenance, it is not possible to make a judgment on all bridges in the road network, which is not conducive to the wide application in actual engineering practice
Using the method of attribute reduction can easily lead to an explosive increase in the amount of calculation

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Decision-making method for determining bridge maintenance sequence
  • Decision-making method for determining bridge maintenance sequence
  • Decision-making method for determining bridge maintenance sequence

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0172] According to a specific embodiment of the present invention, the decision-making method for determining the bridge maintenance sequence proposed by the present invention will be described in detail below.

[0173] The invention provides a kind of decision-making method of determining bridge maintenance sequence, comprises the following steps:

[0174] Determine the bridge evaluation type and impact factors;

[0175] Determine the initialization weights of the evaluation type and impact factor respectively, specifically including: obtaining the first initialization weight through transfer learning, obtaining the second initialization weight through the Delphi method, and determining the evaluation type and impact factor according to the first initialization weight and the second initialization weight Initialize weights;

[0176] Obtain the bridge maintenance score and the difference between the actual score;

[0177] According to the difference between the bridge mainten...

Embodiment 2

[0182] According to a specific embodiment of the present invention, the decision-making method for determining the bridge maintenance sequence proposed by the present invention will be described in detail below.

[0183] The invention provides a kind of decision-making method of determining bridge maintenance sequence, comprises the following steps:

[0184] Determine the bridge evaluation type and impact factors;

[0185] Determine the initialization weights of the evaluation type and impact factor respectively, specifically including: obtaining the first initialization weight through transfer learning, obtaining the second initialization weight through the Delphi method, and determining the evaluation type and impact factor according to the first initialization weight and the second initialization weight Initial weight; the initial weight of the evaluation type and impact factor are determined by the following formulas:

[0186] The initialization weight W of each evaluatio...

Embodiment 3

[0210] According to a specific embodiment of the present invention, the decision-making method for determining the bridge maintenance sequence proposed by the present invention will be described in detail below.

[0211] The invention provides a kind of decision-making method of determining bridge maintenance sequence, comprises the following steps:

[0212] Determine the bridge evaluation type and influencing factors; according to the indicators that affect the bridge maintenance score, determine the bridge evaluation type through principal component analysis; the evaluation type includes the technical status of components, bridge structure form and scale, adaptability, traffic capacity and disaster resistance; The influencing factors of the technical status of internal components include the number scale of disease types, component evaluation results and component evaluation results; the influencing factors of bridge structure form and scale include bridge structure type and ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a decision-making method for determining a bridge maintenance sequence, and belongs to the technical field of bridge maintenance. According to the method, a comprehensive evaluation type with representativeness on a bridge maintenance score is extracted through principal component analysis, and then the evaluation type and an initial weight of an influence factor are obtained through transfer learning and a Delphi method; obtaining a difference value between the bridge maintenance score and the actual score; the evaluation type weight is optimized; the influence factor weight is optimized according to the evaluation type error; obtaining an updated bridge maintenance score; sorting the updated bridge maintenance scores by adopting a merge sorting method; and the bridge is maintained according to the bridge maintenance sequence. According to the method, initial weights of evaluation types and influence factors are obtained by adopting transfer learning and a Delphi method, the weights of the evaluation types are optimized, and the weights of the influence factors are optimized according to evaluation type errors; and the bridge maintenance scores are ranked after being recalculated, so that the accuracy of bridge maintenance is improved.

Description

technical field [0001] The invention relates to the technical field of bridge maintenance, in particular to a decision-making method for determining the order of bridge maintenance. Background technique [0002] At present, the bridge maintenance work in our country is simply repairing the bridges with existing problems, that is, it is in the stage of passive maintenance. Since the construction of infrastructure in our country takes up most of the financial budget, due to the limitation of national financial resources, the funds invested in bridge repair and maintenance are far from meeting the needs, so it is necessary to allocate limited funds reasonably. [0003] The ordering and optimization of bridge maintenance projects need to consider the priority of each project and the balance between regions. The current bridge maintenance sorting methods are commonly used in the following two ways. The first is the sorting among many optional maintenance schemes; the second is t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06Q10/00G06Q10/04G06Q50/08
CPCG06Q10/06395G06Q10/06393G06Q10/20G06Q10/04G06Q50/08Y02P90/30
Inventor 张磊朱建明高莺燕徐岚赵之杰申强陈勤霞冯辉王龙凤吴秀松李瑞焕高升张尧
Owner 北京新桥技术发展有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products