Construction method for reinforcing foundation pit of overpass rail transit
A construction method and rail transit technology, applied in infrastructure engineering, excavation, artificial islands, etc., can solve problems such as low construction efficiency, high cost, and large material consumption, and achieve the effect of reducing construction costs and increasing construction speed
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0029] The specific embodiments of the present invention will be further described in detail below with reference to the examples. The following examples are intended to illustrate the present invention, but not to limit the scope of the present invention.
[0030] The concrete construction steps of the present invention are as follows: after determining the construction parameters of the three-axis stirring pile and the MJS construction method pile through experiments, start the foundation pit reinforcement construction, and construct the foundation pit reinforcement for the upper-span rail transit first. Three-axis stirring pile, after the three-axis stirring pile reaches a certain strength, then construct the MJS construction method pile;
[0031] The three-axis stirring pile construction method includes:
[0032] A1. Setting of limit device: stake out the outline of the subway, set up bamboo piles every 3.0m, and set up eye-catching warning signs. The pile is mechanicall...