Power grid capital construction project optimization method and system based on life cycle cost
A technology with full life cycle and cost, applied in the field of grid infrastructure project optimization method and system, which can solve the problems of poor accuracy and low rationality.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0042] The present invention will be further described in detail below in conjunction with the description of the drawings and specific embodiments.
[0043] see figure 1 , a power grid infrastructure project optimization method based on life cycle cost, the method includes the following steps:
[0044] S1. Set up a variety of alternative construction schemes for power grid infrastructure projects according to the construction goals;
[0045] The construction target includes at least one of the voltage level, the number of main transformers, the capacity of the main transformers, the quantity of GIS, the way of GIS deployment, the transmission distance, the transmission area and the line type of the power grid infrastructure project;
[0046] First use the construction target to generate the equipment list and the floor plan, and then use the equipment list and the floor plan to generate the 3D model of the power grid infrastructure project, and then combine the equipment lis...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com