Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

227 results about "Life cycle costs" patented technology

Whole-life cost is the total expense of owning an asset over its entire life, from purchase to disposal, as determined by financial analysis. It is also known as a "life-cycle" cost, which includes purchase and installation, design and building costs, operating costs, maintenance, associated financing costs, depreciation and disposal costs.

Detection method of road-surface evenness

The invention discloses a detection method of road-surface evenness; in the measurement process, an accelerometer is utilized to detect relative displacement of a laser ranging device owning to road surface bumping, a three-dimensional gyroscope is utilized to detect the inclined angle of the laser ranging device owning to road surface bumping, and a three-dimensional synthesis attitude angle is synthesized under a two-directional coordinate system according to the attitude angles along the three directions; the relative displacement, the three-dimensional synthesis attitude angle and the distance measured by the laser ranging device are obtained, and vertical distance between the laser ranging device and the road surface is calculated; according to the detection density, all vertical distances are obtained, and a difference value with a standard reference distance is obtained, thereby obtaining a profile curve and the road-surface evenness. The method eliminates the problems that thealtitude of the laser ranging device is inclined owning to road surface bumping and data loses efficiency caused by position deviation, and solves the problem that the road-surface evenness can not bedetected under the low-speed (<25km/h) condition, thereby improving the detection efficiency, reducing the life cycle cost of highroads and improving the service life of the highroads.
Owner:ROADMAINT CO LTD

Asset life information integrated control method and device suitable for power system

InactiveCN102142111AAchieve horizontal penetrationEffective connectionData processing applicationsPagerElectric power system
The invention relates to an asset life information integrated control method and a device suitable for a power system. The method comprises the following steps: an asset strategy auxiliary decision module is used for controlling a power grid planning module according to life cycle cost evaluation results of the existing equipment to select a corresponding planning scheme from a database server and sending the life cycle cost evaluation results to a project control module. The asset life information integrated control device suitable for the power system comprises the database server, a PSP (Python Server Pagers) application server, a BW (Band Width) application server, a BPS (Basic Programming System) application server, an SRM (Storage Resource Management) application server, a PMS (Purchase Management System) application server, a WRP (Wireless Routing Protocol) application server, an internal client, an external client, an internal bus and an Internet. Compared with the prior art, the asset life information integrated control method and the device suitable for the power system have the advantages of forming the evaluation decision of closed-loop linkage, optimizing the life cycle cost of the equipment and the like.
Owner:SHANGHAI MUNICIPAL ELECTRIC POWER CO +2

Optimized planning method of electric vehicle charging station based on whole life cycle cost

InactiveCN104866915AReflect rationalityDemonstrate accuracyForecastingPower qualityElectric network
The invention discloses an optimized planning method of an electric vehicle charging station based on whole life cycle cost, wherein the optimized planning method analyzes the cost benefit of a charging station and calculates the whole life cycle cost. The invention suggests estimation of a charging station capacity by means of road network traffic flow information. Maximization of net present value profit is used as an optimization target. The position and the capacity of the charging station are determined according to the road network traffic flow, electric network power quality and economic performance and user charging requirement as constraint conditions. Furthermore, the invention provides a charging station optimization planning model based on the whole life cycle cost, and furthermore the charging station optimization planning model is solved according to a quantum genetic algorithm. The optimized planning method can plan the electric vehicle charging station effectively and accurately, thereby obtaining an optimal station address and an optimal capacity, and calculating a maximal net present value. The optimized planning method compensates insufficiencies in present other electric vehicle charging station planning methods to a certain extent, and furthermore can obtain higher convergence speed and more accurate value in actual operation.
Owner:HUNAN UNIV

Capacity optimization configuration method for hybrid energy storage system orientating optimization operation of power distribution network

The invention discloses a capacity optimization configuration method for a hybrid energy storage system orientating optimization operation of a power distribution network. The capacity optimization configuration method comprises the steps of obtaining imbalance power between the optimal output and photovoltaic actual output when an optical storage system participates in operation of the power distribution network firstly, taking the imbalance power as a hybrid energy storage reference power, adopting ensemble empirical mode decomposition to decompose the imbalance power into a series of intrinsic mode functions, and performing recursion Hilbert conversion to obtain an instantaneous frequency-time curve of each intrinsic mode function separately; according to power type and energy type energy storage characteristics, determining crossover frequency by taking least aliasing of the instantaneous frequency-time curves as a principle, and stabilizing the high-frequency components and low-frequency components of the imbalance power by adopting power type energy storage and energy type energy storage respectively; and finally, by considering charging-discharging efficiency, state of charge and life cycle cost, a power type and energy type energy storage rate power and rate capacity economic optimal configuration scheme is proposed. Compared with a conventional method, new energy output can be compensated, consumption capability to new energy can be improved, and active participation to the optimization operation of the power distribution network can be realized.
Owner:STATE GRID JIANGSU ELECTRIC POWER CO ELECTRIC POWER RES INST +3

Probability whole life cycle cost-based power transformer performance comprehensive evaluation method

The invention discloses a probability whole life cycle cost-based power transformer performance evaluation method, which mainly comprises the steps: establishing a whole life cycle cost model of a power transformer; estimating a probability distribution function of the whole life cycle cost of the power transformer; quantitatively processing qualitative indicators; processing data in a standardized way; processing the data in a dimensionless way; evaluating an alternative scheme by using a matter-element model; determine an optimal scheme. According to the probability whole life cycle cost-based power transformer performance comprehensive evaluation method, the probability whole life cycle cost model is constructed by introducing the statistical theory, the cost parameter uncertainty is improved, the theory of matter-element is adopted to assess the alternative scheme, and thus the optimal scheme is more reasonable. The invention also discloses a probability whole life cycle cost-based power transformer performance comprehensive evaluation method, the reliability, technology advancement, serviceability and environmental impact indicators are increased, the efficient combination of reliability of the power transformer and reliability is realized, the utilization rate of the transformer is enhanced, and the power grid assets management level is improved.
Owner:SHIJIAZHUANG TIEDAO UNIV

Parameter matching joint optimization method of fuel cell hybrid tramcar

The invention discloses a parameter matching joint optimization method of a fuel cell hybrid tramcar. The method includes: according to operation needs and target route conditions, designing tramcar power system indexes and tramcar operation conditions and determining the parameter feasible region of a fuel cell hybrid power system to form a preliminary parameter matching alternative scheme; usingwhole life cycle cost, service time and the power performance of the whole tramcar as the optimization targets to build a multi-target optimization function, using the self-adaptation swarm intelligent optimization algorithm based on probability indexes to complete load allocation under optional parameter combination, and using the load allocation when the value of the multi-target optimization function is minimum as the optimal allocation result under the parameter matching combination; traversing all alternative parameter combinations, and searching for the global optimum on the basis of the individual optimum to complete the optimal parameter matching optimization calculation of the fuel cell hybrid tramcar. By the method, hydrogen consumption can be reduced effectively, the efficiencyof the whole tramcar can be increased, and optimal economical efficiency during operation can be achieved.
Owner:SOUTHWEST JIAOTONG UNIV

Distribution network planning scheme evaluation data processing system

InactiveCN104715294AReliable demandFlexible demandForecastingEvaluation dataFlexibility Index
The invention discloses a distribution network planning scheme evaluation data processing system which comprises an economic index processing module based on whole life cycle cost, a reliability index processing module based on a minimal path method, and a flexibility index processing module based on maximum power supply capability. The economic index processing module based on the whole life cycle cost is used for taking the investment cost, operation and maintenance cost, life period and the like as input data, calculating and processing the data and outputting the whole life cycle cost and traditional financial evaluation indexes; the reliability index processing module is used for taking the planning scheme structure, equipment parameters and the like as input data, outputting the system average interruption frequency and other indexes of load nodes and the equivalent mean interruption duration on the system side and the other indexes; and the flexibility index processing module based on the maximum power supply capability is used for outputting the maximum power supply capability, the network transfer capability and the other indexes. Finally, comprehensive evaluation of multiple indexes is realized by adopting a fuzzy mathematics comprehensive evaluation module. Compared with the prior art, the distribution network planning scheme evaluation data processing system disclosed by the invention has the advantages of comprehensiveness and practicality.
Owner:STATE GRID CORP OF CHINA +3

High-frequency high-voltage transformer design optimization method based on genetic algorithm

The invention discloses a high-frequency high-voltage transformer design optimization method based on a genetic algorithm. On the basis of a minimum loss formula of a transformer and the insulation dimension and the iron core shape of the transformer, a mathematical model is established, a genetic algorithm is adopted for optimizing the transformer by taking the number of turns of primary sides and the layer number of secondary sides as optimization variables and taking efficiency as an optimization target, so that the efficiency of the transformer is maximized, the loss of the transformer is minimized, temperature rise is minimized under an equal condition, the leakage inductance and the distribution capacitance of the transformer are fully utilized to participate in the work of a power system to form an LCC (Life Cycle Costs) resonance circuit, and the loss of the transformer is reduced so as to lower the temperature rise. Compared with the prior art, the invention introduces the genetic algorithm, the genetic algorithm exhibits a problem non-relevant quick and random search capability, searches by starting from a group and has the characteristic of concurrency, and a plurality of individuals can be simultaneously compared to greatly quicken optimal solution search speed.
Owner:JIANGSU UNIV OF SCI & TECH

Power distribution line tower span panning method based on load reliability

The invention discloses a power distribution line tower span panning method based on load reliability. The randomness of the maximum wind velocities of typhoons and the frequency of typhoon landing are taken into account; an overhead power distribution line load reliability calculation model is built based on the type I distribution of the maximum wind velocity values of typhoons; with the whole life cycle cost of a power distribution system as a target function and a pole model number and a span length as decision variables, an overhead power distribution line tower and span planning model is built. The power distribution line tower span panning method based on the load reliability is characterized in that the tower and span planning model with the whole life cycle cost of the power distribution system as the target function and the line span as a constraint condition is built by taking the power interruption cost due to line pole collapse and breakage faults into account in combination with a tower investment cost and a maintenance cost. Based on the planning method, the planning personnel can control the load risk level of an overhead power distribution line visually, and the optimal scheme considering both economic efficiency and reliability can be obtained.
Owner:CHONGQING UNIV

Method for selecting neutral point grounding mode of medium voltage distribution network

The invention discloses a method for selecting a neutral point grounding mode of a medium voltage distribution network. According to the method, according to the difference of the influences of different neutral point grounding modes on the medium voltage distribution network, the reliability of the power distribution network under the different neutral point grounding modes is evaluated and compared through quantitative calculation of the line fault trip probability of the power distribution network, reliability evaluation and operating cost analysis of the power distribution network under the different neutral point grounding modes are combined, so that the optimal neutral point grounding mode of the power distribution network is selected by the way of calculating the whole life cycle cost of the power distribution network under the different neutral point grounding modes and reliability factors in a combined mode, the design and transformation engineering requirement of the medium voltage distribution network can be met, and the security and the operating maintenance efficiency of the power distribution network are improved. By the adoption of the method, the high reliability neutral point grounding mode with optimal economy can be decided on the basis that the influence of the different neutral point grounding modes on the reliability and the construction operating cost of the medium voltage distribution network is calculated.
Owner:SHENZHEN POWER SUPPLY BUREAU +1

Micro-energy grid multi-objective planning method based on power-to-gas technology and renewable energy utilization

The invention relates to the fields of micro-energy grid and distributed energy planning, provides a micro-energy grid multi-objective planning method considering a power-to-gas technology and renewable energy utilization, and has the guiding significance for micro-energy grid planning comprising a wind generator, photovoltaic, cooling, heating and power combined system, a P2GSS, a storage batteryand the like. The invention discloses the micro-energy grid multi-objective planning method based on the power-to-gas technology and renewable energy utilization; the method comprises the steps that(1) modeling of a micro-energy grid is carried out; (2) the whole life cycle cost of the micro-energy grid is calculated on the basis of a full life cycle method, wherein the minimum total life cyclecost, and the lowest annual carbon dioxide emission amount are taken as an optimization objective, and the influence of the electric refrigeration proportion and the electric heating proportion and other operation modes is considered, and a multi-objective optimization configuration method aiming at the capacity of the key equipment of the micro-energy grid is established; and (3) the multi-objective planning method for the micro-energy grid is provided through comparison of different scenes. The method is mainly applied to the micro-energy grid and distributed energy planning occasions.
Owner:TIANJIN UNIV

Method for evaluating economic operation year range of transformer substation

The invention discloses a method for evaluating the economic operation year range of a transformer substation. According to an original fault rate model based on Weibull distribution or index distribution, only the service age is taken as the variable, various other factors influencing the fault rate of the transformer substation are not considered, and thus the original fault rate model is not suitable for being taken as a model for predicting the fault rate of the transformer substation. According to the method for evaluating the economic operation year range of the transformer substation, the transformer substation is evaluated comprehensively in the aspects of the operating environment and the quality condition, the influence of the two factors on the defect-level fault rate, the invalid-level fault rate and the accident-level fault rate of the transformer substation is analyzed by means of a least square support vector machine under the condition that the different operating times of the transformer substation are considered, the annual maintenance cost range and the fault cost range of the transformer substation under the conditions of the three types of fault rates are obtained by combining the interval analysis method and the whole life cycle cost theory, and finally the operating year range in which the annual average cost of the transformer substation is lowest is taken as the economic operation year range of the transformer substation. The method can provide beneficial guidance for decisions such as power grid planning and transformer substation transformation.
Owner:STATE GRID CORP OF CHINA +1

Method for evaluating economy of differential planning of electric system

ActiveCN103065057AIntuitive comparison of economicalRealization of economic evaluationData processing applicationsSpecial data processing applicationsDesign standardCost effectiveness
The invention discloses a method for evaluating economy of for differential planning of an electric system. Based on principles and requirements on differential planning of a large power grid, a life cycle cost theory is combined with a 'with and without comparison' theory in disaster economics, a set of differential life cycle cost-effectiveness economy evaluation system is provided; increased cost, reduced benefit, disaster happening time and probability are comprehensively considered, three economy evaluation indexes about accumulated increased cost, expected net benefit and benefit cost are provided; difference between service lives and operation time of different equipment is comprehensively considered, and via determining a unified time period, economy evaluation from equipment level (unit piece) to a system level (multiunit pieces) for the differential planning is realized. The method for evaluating the economy of for the differential planning of the electric system has important instructing significance for selection of reinforcing equipment, determination of design standards and comparison and selection of an optimum differential planning scheme in the differential planning of the power grid.
Owner:WUHAN UNIV

Distribution network energy storage optimization configuration method considering whole life cycle cost

The invention discloses a distribution network energy storage optimization configuration method considering whole life cycle cost. A two-stage optimization solution method is adopted to solve the problems of distribution network energy storage addressing and constant volume; from the aspects of energy storage to stabilize voltage fluctuations caused by distributed power and load, with the whole life cycle cost of energy storage as an optimization goal, a two-stage optimization model is established; in a first stage, candidate nodes are screened through a genetic algorithm and a simulated annealing algorithm, and energy storage required mounting nodes and the energy storage operation strategy and the minimum mounting capacity of each node are outputted finally; and in a second stage, the service life of the energy storage is considered based on the optimization result in the first stage, and the energy storage capacity configuration with the lowest whole life cycle cost is optimized through the genetic algorithm and the simulated annealing algorithm. The method considers the random output fluctuation of the distributed power and the whole life cycle cost of the energy storage system, and can obtain a more economical energy storage location and a capacity allocation scheme for the distribution network, and a reference is provided for the distribution network energy storage optimization configuration method.
Owner:TIANJIN UNIV +3
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products