Reservoir door blocking sand treatment method based on movable flow guide pile group
A technology for blocking sand and pile groups, which is applied in river regulation, sheet pile walls, foundation structure engineering, etc. It can solve the problems of high equipment cost and labor cost, difficult operation, large amount of sand dredging, etc., and achieve sand dredging Low-cost, low-cost, and time-sensitive effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] like Figure 1 to Figure 3 As shown, the reservoir blocking sand control method based on 2 groups of mobile diversion piles of the present invention is carried out according to the following steps:
[0032] The first step is to drive a pile, which is called a diversion pile 2;
[0033] Two rows of diversion piles 2 are installed at the intersection of the main stream 7 and the tributary 8 of the reservoir. The diversion piles 2 can be installed before the formation of the blocking sand 12 or after the formation of the blocking sand 12. The two rows of diversion piles 2 are respectively The straight lines are parallel to each other and both close the intersection of the main stream 7 and the tributary 8 of the reservoir; the two rows of diversion piles 2 are the main stream side row piles 9 and the tributary side row piles 10 respectively, and the main stream side row piles 9 and the tributary side row piles 10 form piles group;
[0034] The extension direction of the ...