Building bridge pier supporting formwork and pouring component thereof
A technology for bridge piers and bridges, which is applied in the field of building bridge pier support formwork and its pouring components, which can solve the problems of inability to assist bridge piers to be reinforced and to resist lateral impact positioning, difficult to vibrate bridge pier concrete, and insufficient vibration for bridge pier pouring. The effect of tamping and forming, ensuring the density and use strength, and facilitating the effect of pouring and forming
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] see Figure 1-3 , the present invention provides a technical solution: a support formwork for a pier of a building bridge, comprising:
[0046] The pier foundation pit 1 has reserved pits 2 at equal intervals in the compacted soil on its sides, and a bottom positioning net 3 is fixedly installed at the bottom of the pier foundation pit 1, and a positioning base 4 is arranged on the side of the top entrance of the bridge pier foundation pit 1 ;
[0047]The reserved pit 2 is reserved to facilitate the deep vibrating of concrete pouring in the later stage, and the width of the reserved pit 2 is smaller than the width of the side positioning plate 7, and both are set in an arc shape. The outer wall of the side positioning plate 7 and the pier foundation The inner walls of the pit 1 are set to fit each other, and the side locating plate 7 is provided to isolate the pier foundation pit 1 and the reserved pit 2 from each other, so that the components in the inner space of the...
Embodiment 2
[0053] see figure 1 and Figure 4-8 , the present invention provides another technical solution: a pouring component for the support formwork of a bridge pier of a building, comprising:
[0054] The pier foundation pit 1 has reserved pits 2 at equal intervals in the compacted soil on its sides, and a bottom positioning net 3 is fixedly installed at the bottom of the pier foundation pit 1, and a positioning base 4 is arranged on the side of the top entrance of the bridge pier foundation pit 1 ;
[0055] like Figure 4-6 The technical solution shown also includes: a guide frame 6, which is fixed on the outer wall of the support outer plate 5, and the guide frame 6 is vertically coaxially distributed with the reserved pit 2, and the bottom of the support outer plate 5 is fixed with a side positioning. Plate 7, and the side positioning plate 7 penetrates to the inner wall of the pier foundation pit 1, and is also located on the side of the reserved pit 2;
[0056] The position...