Method for producing slicane cross-linking ethylene-propylene rubber throuth one-step method
A technology of ethylene-propylene rubber and silane cross-linking is applied in the field of one-step silane-cross-linked ethylene-propylene rubber production, which can solve the problems of high labor intensity, poor stability, and high product density, and can reduce labor intensity and improve purity. degree, good product quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
example 1
[0059] A. Weigh the reaction raw materials according to the following ratio:
[0060] Ethylene Propylene Rubber 100kg,
[0061] polyethylene 20 kg,
[0062] Compound silane coupling agent 1.5 kg;
[0063] B. Add the above raw materials directly to the extrusion equipment without mixing, the temperature is about 180°C, the pressure is 50bar, and the reaction time is about 14 minutes;
[0064] C. The process conditions of the extruder are:
[0065] The first zone is 150℃~165℃, the second zone is 175℃~185℃, the third zone is 185℃~200℃,
[0066] The fourth zone is 200℃~230℃, the fifth zone is 200℃~230℃, the die head is 200℃~230℃;
[0067] D. Cross-linking is carried out in a humid environment at room temperature.
[0068] E. The formula of compound silane coupling agent is:
[0069] Vinyltrimethoxysilane (VTES) 45 kg,
[0070] 6 kg of dicumyl peroxide (DCP),
[0071] Dibutyltin dilaurate (DBTL) 8 kg,
[0072] Antioxidant (1010) 6 kg,
[0073] PE paraffin 30 kg.
[0074] T...
example 2
[0078] A. Weigh the reaction raw materials according to the following ratio:
[0079] Ethylene Propylene Rubber 100kg,
[0080] Polyethylene 40 kg,
[0081] Compound silane coupling agent 4 kg;
[0082] B. Add the above raw materials directly to the extrusion equipment without mixing. The temperature is about 220°C, the pressure is 56 bar, and the reaction time is 5 minutes.
[0083] C. The process conditions of the extruder are:
[0084] The first zone is 150℃~165℃, the second zone is 175℃~185℃, the third zone is 185℃~200℃,
[0085] The fourth zone is 200℃~230℃, the fifth zone is 200℃~230℃, and the die head is 200℃~230℃;
[0086] D. Cross-linking is carried out in water at about 70°C.
[0087] The rest are the same as Example 1.
example 3
[0089] A. Weigh the reaction raw materials according to the following ratio:
[0090] Ethylene Propylene Rubber 100kg,
[0091] Polyethylene 30 kg,
[0092] Compound silane coupling agent 2 kg;
[0093] B. Add the above raw materials directly to the extrusion equipment without mixing. The temperature is about 200°C, the pressure is 56 bar, and the reaction time is 10 minutes.
[0094] C. The process conditions of the extruder are:
[0095] The first zone is 150℃~165℃, the second zone is 175℃~185℃, the third zone is 185℃~200℃,
[0096] The fourth zone is 200℃~230℃, the fifth zone is 200℃~230℃, and the die head is 200℃~230℃;
[0097] D. Cross-linking is carried out in water at about 60°C.
PUM
| Property | Measurement | Unit |
|---|---|---|
| density | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More