Forward channel schedule algorithm for HDR system
A forward channel and scheduling algorithm technology, applied in the field of forward channel scheduling algorithms, can solve problems such as the inability to meet the QoS requirements of mobile terminals
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] figure 2shows the steps involved in the scheduling algorithm according to one embodiment of the invention, while image 3 is a graph showing some possible relationships between the number of mobile terminals and the scaling factor (α(n)) explained in detail below.
[0032] like figure 2 As shown, the scheduling algorithm includes collecting state information of connected terminals and calculating a predetermined weight (α(n)) (S20-S23) proportional to the number of connected terminals, based on the collected state information and weighting (α( n)) calculates the priority value of each terminal (S24), and selects the terminal having the highest priority value and provides the service to the selected terminal (S25).
[0033] Formula (2) is a formula for calculating the priority (P) value in the scheduling algorithm according to the present invention.
[0034] P i = ( - log ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 