Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

32results about How to "Reliable health status" patented technology

Progressive health monitoring method for cable system in cable structure based on angle monitoring

The invention relates to an incremental health monitoring method in a cable system of a cable structure based on angular coordinate monitoring, which takes that linear relation between current value vectors of values to be monitored and initial value vectors of the values to be monitored, and the linear relation between unit damage value change arrays of the values to be monitored and current nominal damage vectors are similar into consideration on the premise of taking angular coordinates as values to be monitored, in particular when damaged cables are more or damage extent is larger, the linear relation characteristic is more obvious. In order to overcome the defect, the invention provides a method for using the linear relations to perform piecewise approximation on nonlinear relations based on the angular coordinate monitoring, divides a large interval into a plurality of continuous small intervals; in the small intervals, the linear relations are accurate enough and proper algorithms such as multiobjective optimization algorithm are utilized to calculate noninferior solutions of current cable damage vectors, and then positions of the damaged cables and the damage extent of the cables are determined accurately.
Owner:华新建工集团有限公司 +1

Progressive health monitoring method for cable system in cable structure based on cable force monitoring

The invention relates to a progressive health monitoring method for a cable system in a cable structure on the basis of cable tension monitoring. On the premise of taking cable tension as the monitored value, the progressive health monitoring method considers that linear relations among a current value vector of a monitored value, an initial value vector of the monitored value, a value change matrix of the unit damage monitored value and a current nominal damage vector are approximate, and particularly nonlinear relation characteristics between the vectors are more obvious when the number of damaged cables is numerous or the damage degree is larger. The invention provides the method for piecewise approximation of nonlinear relations by the linear relations on the basis of cable tension monitoring in order to overcome the defects. The method splits a large section into a plurality of continuous subsections; the linear relations in each subsection is accurate enough; and a non-inferior solution of a current cable damage vector can be calculated in each subsection by a proper algorithm such as a multiobjective optimization algorithm, so that the position and the damage degree of a damaged cable can be accurately determined.
Owner:JIANGSU XINTUO CONSTR GRP +1

Progressive health monitoring method of cable system based on mixed monitoring in presence of support seat settlement

The invention provides a progressive health monitoring method of cable system based on mixed monitoring in the presence of support seat settlement. Whether a mechanical calculation standard model with a re-updated structure is needed or not is determined on the basis of the mixed monitoring through monitoring the coordinates of a structure support seat, the fact that the current monitored value vectors have the approximate linear relationship with the monitored initial vector, the unit damage monitored quantity change matrices and the current nominal damage vector is taken into consideration. In order to overcome the defect, the invention provides a method for piecewise approximation to the non-linear relationship by using the linear relationship, a large interval is divided into small continuous intervals, the linear relationship in the small intervals is accurate enough, proper algorithms of the multi-objective optimization algorithm and the like can be utilized in each small interval for calculating the noninferior solution of the current cable damage vector, and thereby, the position and the damage degree of the damaged cable can be accurately determined.
Owner:江苏大公建设有限公司 +1

Progressive type method for identifying loose supporting ropes based on space coordinate monitoring during support settlement

The invention relates to a progressive type method for identifying loose supporting ropes based on space coordinate monitoring during support settlement, which is based on strain monitoring and is used for identifying the loose supporting ropes by monitoring the coordinates of a support of a structure. In consideration of the condition that a linear relationship among the vector of the current numerical value of the quantity to be monitored, the vector of the initial numerical value of the quantity to be monitored, a change matrix of the numerical value of the virtual unit damage quantity to be monitored and a current nominal virtual damage vector is approximate, the invention provides a method using the linear relationship to sectionally approach to a nonlinear relationship in order to overcome the defect, virtual damaged ropes can be identified, and the residual virtual damaged ropes are just the loose supporting ropes after a true damaged rope is distinguished from the virtual damaged ropes by using the methods of nondestructive examination and the like, so that the rope length which needs to be regulated can be determined according to a relationship between the looseness degree and the virtual damage degree.
Owner:华新建工集团有限公司 +1

Progressive method for distinguishing slack supporting cable based on cable force monitoring during support settlement

The invention relates to a progressive method for distinguishing a slack supporting cable based on cable force monitoring during support settlement; when the method is used for distinguishing the slack supporting cable based on the cable force monitoring by the coordinates of the support of a monitoring structure, the method considers that the linear relationship between the current numerical value vector of the monitored quantity and the initial numerical value vector of the monitored quantity, the numerical value changing matrix of the virtual unit damage monitored quantity and the current nominal damage vector is approximated; in order to overcome the defect, the invention provides a method which piecewise approximates to the non-linear relationship by using the linear relationship and can distinguish the virtual damage cable; after the true damage cable is distinguished by using methods such as a nondestructive testing method and the like, the remaining virtual damage cable is the slack supporting cable; and the length of the cable needing to be regulated can be determined according to the relationship between the slack degree and the virtual damage degree.
Owner:江苏大公建设有限公司 +1

Progressive type healthy monitoring method of rope system based on space coordinate monitoring during support settlement

The invention relates to a progressive type healthy monitoring method of a rope system based on space coordinate monitoring during support settlement, which is based on the space coordinate monitoring and determines whether a mechanical calculation reference model of a structure needs to be updated again or not by monitoring the coordinates of a support of the structure. In consideration of the condition that a linear relationship among the vector of the current numerical value of the quantity to be monitored, the vector of the initial numerical value of the quantity to be monitored, a change matrix of the unit damage quantity to be monitored and a current nominal damage vector is approximate, the invention provides a method using the linear relationship to sectionally approach to a nonlinear relationship in order to overcome the defect, a big interval is divided into a plurality of continuous small intervals, the linear relationship is accurate enough in each small interval, and the non-inferior solution of the current rope damage vector can be calculated in each small interval by utilizing the proper algorithms of a multi-objective optimization algorithm and the like, so that the position of a damaged rope and the damage degree thereof can be more accurately determined.
Owner:JIANGSU XINTUO CONSTR GRP +1

Progressive health monitoring method of cable system based on strain monitoring during support settlement

The invention discloses a progressive health monitoring method of a cable system based on strain monitoring during support settlement, which is based on strain monitoring, determines whether to re-update a mechanical calculation baseline model of the structure through monitoring a structure support coordinate, taking into account the approximate linear relationship between the current value vector of the monitored-volume and the initial value vector of the monitored-volume, the unit damage monitored-volume change matrix and the current nominal damage vector. For overcoming the disadvantage, the invention provides the method which means that the linear relationship is segmented to be close to the non-linear relationship; in the method, a large interval is divided into consecutive small intervals, the linear relationship in each of the small intervals is accurate enough, the non-inferior solution of the current cable damage vector can be calculated in the small intervals through the multi-objective optimization algorithm and other appropriate algorithms, accordingly, the location and the damage degree of the damaged-cable can be determined accurately.
Owner:华新建工集团有限公司 +1

Progressive type healthy monitoring method of rope system based on angle monitoring during support settlement

The invention relates to a progressive type healthy monitoring method of a rope system based on angle monitoring during support settlement, which is based on the angle monitoring and determines whether a mechanical calculation reference model of a structure needs to be updated again or not by monitoring the coordinates of a support of the structure. In consideration of the condition that a linear relationship among the vector of the current numerical value of the quantity to be monitored, the vector of the initial numerical value of the quantity to be monitored, a change matrix of the unit damage quantity to be monitored and a current nominal damage vector is approximate, the invention provides a method using the linear relationship to sectionally approach to a nonlinear relationship in order to overcome the defect, a big interval is divided into a plurality of continuous small intervals, the linear relationship is accurate enough in each small interval, and the non-inferior solution of the current rope damage vector can be calculated in each small interval by utilizing the proper algorithms of a multi-objective optimization algorithm and the like, so that the position of a damaged rope and the damage degree thereof can be more accurately determined.
Owner:JIANGSU XINTUO CONSTR GRP +1

Progressive health monitoring method for cable system in cable structure based on angle monitoring

The invention relates to an incremental health monitoring method in a cable system of a cable structure based on angular coordinate monitoring, which takes that linear relation between current value vectors of values to be monitored and initial value vectors of the values to be monitored, and the linear relation between unit damage value change arrays of the values to be monitored and current nominal damage vectors are similar into consideration on the premise of taking angular coordinates as values to be monitored, in particular when damaged cables are more or damage extent is larger, the linear relation characteristic is more obvious. In order to overcome the defect, the invention provides a method for using the linear relations to perform piecewise approximation on nonlinear relations based on the angular coordinate monitoring, divides a large interval into a plurality of continuous small intervals; in the small intervals, the linear relations are accurate enough and proper algorithms such as multiobjective optimization algorithm are utilized to calculate noninferior solutions of current cable damage vectors, and then positions of the damaged cables and the damage extent of thecables are determined accurately.
Owner:华新建工集团有限公司 +1

Progressive health monitoring method for cable system in cable structure based on cable force monitoring

The invention relates to a progressive health monitoring method for a cable system in a cable structure on the basis of cable tension monitoring. On the premise of taking cable tension as the monitored value, the progressive health monitoring method considers that linear relations among a current value vector of a monitored value, an initial value vector of the monitored value, a value change matrix of the unit damage monitored value and a current nominal damage vector are approximate, and particularly nonlinear relation characteristics between the vectors are more obvious when the number of damaged cables is numerous or the damage degree is larger. The invention provides the method for piecewise approximation of nonlinear relations by the linear relations on the basis of cable tension monitoring in order to overcome the defects. The method splits a large section into a plurality of continuous subsections; the linear relations in each subsection is accurate enough; and a non-inferior solution of a current cable damage vector can be calculated in each subsection by a proper algorithm such as a multiobjective optimization algorithm, so that the position and the damage degree of a damaged cable can be accurately determined.
Owner:JIANGSU XINTUO CONSTR GRP +1

Progressive health monitoring method for cable system based on cable force monitoring during support settlement

The invention relates to a progressive health monitoring method for a cable system based on cable force monitoring during support settlement; the method based on the cable monitoring decides whether a mechanical calculation standard model of a structure needs to be updated again or not through the coordinates of the support of a monitoring structure, and considers that the linear relationship between the current numerical value vector of the monitored quantity and the initial numerical value vector of the monitored quantity, the changing matrix of the unit damage monitored quantity and the current nominal damage vector is approximated; in order to overcome the defect; the invention provides a method which piecewise approximates to the non-linear relationship by using the linear relationship and divides a big interval into a continuous one-by-one small minimal intervals; the linear relationship in each minimal interval is enough accurate; the noninferior solution of the current cable damage vector can be figured out by using appropriate algorithms such as a multiple target optimization algorithm in each minimal interval; and accordingly, the position and the damage degree of the damage cable can be accurately determined.
Owner:华新建工集团有限公司 +1

Progressive type healthy monitoring method of rope system based on space coordinate monitoring during support settlement

The invention relates to a progressive type healthy monitoring method of a rope system based on space coordinate monitoring during support settlement, which is based on the space coordinate monitoring and determines whether a mechanical calculation reference model of a structure needs to be updated again or not by monitoring the coordinates of a support of the structure. In consideration of the condition that a linear relationship among the vector of the current numerical value of the quantity to be monitored, the vector of the initial numerical value of the quantity to be monitored, a changematrix of the unit damage quantity to be monitored and a current nominal damage vector is approximate, the invention provides a method using the linear relationship to sectionally approach to a nonlinear relationship in order to overcome the defect, a big interval is divided into a plurality of continuous small intervals, the linear relationship is accurate enough in each small interval, and the non-inferior solution of the current rope damage vector can be calculated in each small interval by utilizing the proper algorithms of a multi-objective optimization algorithm and the like, so that the position of a damaged rope and the damage degree thereof can be more accurately determined.
Owner:JIANGSU XINTUO CONSTR GRP +1

Progressive type method for identifying loose supporting ropes based on space coordinate monitoring during support settlement

The invention relates to a progressive type method for identifying loose supporting ropes based on space coordinate monitoring during support settlement, which is based on strain monitoring and is used for identifying the loose supporting ropes by monitoring the coordinates of a support of a structure. In consideration of the condition that a linear relationship among the vector of the current numerical value of the quantity to be monitored, the vector of the initial numerical value of the quantity to be monitored, a change matrix of the numerical value of the virtual unit damage quantity to be monitored and a current nominal virtual damage vector is approximate, the invention provides a method using the linear relationship to sectionally approach to a nonlinear relationship in order to overcome the defect, virtual damaged ropes can be identified, and the residual virtual damaged ropes are just the loose supporting ropes after a true damaged rope is distinguished from the virtual damaged ropes by using the methods of nondestructive examination and the like, so that the rope length which needs to be regulated can be determined according to a relationship between the looseness degree and the virtual damage degree.
Owner:华新建工集团有限公司 +1

Progressive health monitoring method of cable system based on mixed monitoring in presence of support seat settlement

The invention provides a progressive health monitoring method of cable system based on mixed monitoring in the presence of support seat settlement. Whether a mechanical calculation standard model with a re-updated structure is needed or not is determined on the basis of the mixed monitoring through monitoring the coordinates of a structure support seat, the fact that the current monitored value vectors have the approximate linear relationship with the monitored initial vector, the unit damage monitored quantity change matrices and the current nominal damage vector is taken into consideration.In order to overcome the defect, the invention provides a method for piecewise approximation to the non-linear relationship by using the linear relationship, a large interval is divided into small continuous intervals, the linear relationship in the small intervals is accurate enough, proper algorithms of the multi-objective optimization algorithm and the like can be utilized in each small interval for calculating the noninferior solution of the current cable damage vector, and thereby, the position and the damage degree of the damaged cable can be accurately determined.
Owner:江苏大公建设有限公司 +1

Progressive health monitoring method of cable system based on strain monitoring during support settlement

The invention discloses a progressive health monitoring method of a cable system based on strain monitoring during support settlement, which is based on strain monitoring, determines whether to re-update a mechanical calculation baseline model of the structure through monitoring a structure support coordinate, taking into account the approximate linear relationship between the current value vector of the monitored-volume and the initial value vector of the monitored-volume, the unit damage monitored-volume change matrix and the current nominal damage vector. For overcoming the disadvantage, the invention provides the method which means that the linear relationship is segmented to be close to the non-linear relationship; in the method, a large interval is divided into consecutive small intervals, the linear relationship in each of the small intervals is accurate enough, the non-inferior solution of the current cable damage vector can be calculated in the small intervals through the multi-objective optimization algorithm and other appropriate algorithms, accordingly, the location and the damage degree of the damaged-cable can be determined accurately.
Owner:华新建工集团有限公司 +1

Progressive method for distinguishing slack supporting cable based on cable force monitoring during support settlement

The invention relates to a progressive method for distinguishing a slack supporting cable based on cable force monitoring during support settlement; when the method is used for distinguishing the slack supporting cable based on the cable force monitoring by the coordinates of the support of a monitoring structure, the method considers that the linear relationship between the current numerical value vector of the monitored quantity and the initial numerical value vector of the monitored quantity, the numerical value changing matrix of the virtual unit damage monitored quantity and the current nominal damage vector is approximated; in order to overcome the defect, the invention provides a method which piecewise approximates to the non-linear relationship by using the linear relationship andcan distinguish the virtual damage cable; after the true damage cable is distinguished by using methods such as a nondestructive testing method and the like, the remaining virtual damage cable is theslack supporting cable; and the length of the cable needing to be regulated can be determined according to the relationship between the slack degree and the virtual damage degree.
Owner:江苏大公建设有限公司 +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products