Method and means for providing time delay in downhole well operations
An in-operation and action technology, applied in earth-moving drilling, wellbore/well components, construction, etc., can solve problems such as difficulty in controlling the tensioning spring time, unsuitable for fine-tuning, and poor control of the force-generating mechanism.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0014] The present invention provides a time-delay hydraulic system based on the flow characteristics of substantially Newtonian fluids.
[0015] Figure 1a with Figure 3a A portion of two variants of the tool providing hydraulic load compensation delay are shown. The relative axial force acting between the piston rod 1 and the cylindrical piston housing 2 causes a pressure build-up in one of the two hydraulic chambers 3, 4, the piston housing 2 enclosing the piston rod 1, the hydraulic chamber 3, 4 4 are filled with an incompressible liquid, and the relative movement between the piston rod 1 and the piston housing 2 causes liquid to drain from one chamber 3 to the other chamber 4, or from chamber 4 to chamber 3. Between the piston rod 1 and the piston shell 2, a horizontal floating hydraulic piston sleeve 5 is provided. The horizontal floating hydraulic piston sleeve 5 is respectively supported on each side of the piston sleeve ear by a spring. The axial movement between t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 