Multi-layer anchoring process for cable stayed bridge
An anchoring method and multi-layer technology, applied in the direction of bridges, bridge parts, bridge construction, etc., can solve the problems of large anchor volume, large material consumption, large weight, etc., to achieve a large total pressure bearing area and reduce the anchorage area. , the effect of weight and material reduction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] The embodiments of the present invention are described in detail below in conjunction with the accompanying drawings: this embodiment is implemented on the premise of the technical solution of the present invention, and detailed implementation methods and specific operating procedures are provided, but the protection scope of the present invention is not limited to the following the described embodiment.
[0028] Such as Figure 1-2 As shown, cable 1 bears tension 2. The tension 2 is transmitted to the beam 5 through the cable anchor head 3 and the anchor structure 4, and is balanced. At this time, the total height of the anchorage between the anchor structure 4 and the beam 5 is 6. The force transmission between the anchor structure 4 and the beam 5 is through figure 2 The pressure bearing surface 7 shown is realized, and the pressure bearing surface 7 provides counterforce at this moment. If the material of the anchorage structure is steel, its compressive streng...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com