A method for preparing asphalt base waterproofing material
A waterproof material, asphalt-based technology, applied in building thermal insulation materials, chemical instruments and methods, building components, etc., can solve problems affecting product use and quality, unguaranteed uniformity and stability, poor compatibility, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0012] a. Immerse the purified bentonite crushed by conventional methods in water, add quaternary ammonium salt cations under constant temperature conditions of 75°C, wherein the addition of quaternary ammonium salt cations is 1% of the cation exchange capacity of bentonite, stir for 50min, and obtain the expansion capacity It is 35ml modified bentonite;
[0013] b. Evenly mix 10% of the asphalt mass modified bentonite into construction asphalt, mix evenly to make thin slices with a uniform thickness of 5 mm, freeze at -13°C for 1 hour, break the thin slices evenly, and make the gap between the two pieces Form a gap with a width of 0.3mm, add tap water from the upper part of the gap to cause leakage, and the gap will stop leaking after 25 minutes, and the waterproof material can be obtained.
Embodiment 2
[0015] a. Immerse the purified bentonite after being pulverized by conventional methods in water, add quaternary ammonium salt cations under constant temperature conditions of 75°C, wherein the addition of quaternary ammonium salt cations is 5% of the cation exchange capacity of bentonite, stir for 70min, and obtain the expansion capacity Be the modified bentonite of 20ml;
[0016] b. Mix 30% of asphalt mass modified bentonite into building asphalt, mix evenly to make thin slices with a uniform thickness of 5 mm, freeze at -13°C for 2 hours, break the thin slices evenly, and take one of the fragments The section and the glass surface form a gap with a distance of 0.3 mm. Water leaks from the upper part of the gap, and the gap stops leaking after 28 minutes, and the waterproof material can be obtained.
Embodiment 3
[0018] a. Immerse the bentonite after pulverizing and purifying by conventional method in water, add quaternary ammonium salt cation under 75 ℃ constant temperature condition, wherein the addition of quaternary ammonium salt cation is 9% of bentonite cation exchange capacity, stir 80min, obtain expansion capacity 10ml modified bentonite;
[0019] b. Evenly mix the modified bentonite which accounts for 40% of the asphalt mass into the building asphalt, mix it evenly to make a thin slice with a uniform thickness of 5mm, freeze it at -13°C for 3 hours, break the thin slice evenly, and take one of the pieces The section and the glass surface form a gap with a distance of 0.3mm. Water leaks from the upper part of the gap, and the gap stops leaking after 32 minutes, and the waterproof material can be obtained.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com