Method and base station equipment for dispatching downlink communication resources
A technology of communication resources and base station equipment, applied in wireless communication, communication between multiple stations, electrical components, etc., can solve user delay scheduling, downlink resources are not fully utilized, and base station downlink scheduling balance cannot be effectively realized The balance of property and resource utilization can achieve the effect of improving balance and reducing delay scheduling
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0075] Embodiment 1: Determine the start position of the DRX cycle according to information such as the number of downlink subframes and the configuration of time slot transition points.
[0076] For TDD system frames, generally, the number of downlink subframes and uplink-downlink conversion points contained in different half-frames (or different frames) are the same, so in this embodiment, the system frames and downlink subframes can be Divide intervals for reference to achieve load balancing of downlink resources. In this embodiment, the step 601 specifically includes:
[0077] Step 611 , configure the DRX cycle of the DRX user, divide the DRX cycle into multiple intervals in units of system frames, and evenly allocate the DRX users to each interval.
[0078] Here, it is assumed that the DRX cycle includes N system frames, and each system frame includes 10 subframes. Divide the starting point of the DRX cycle into N consecutive intervals, each interval contains 10 integer...
Embodiment 2
[0089] In the second embodiment, the starting point of the DRX cycle is determined according to the dynamic load of the downlink subframe. The specific implementation method includes the following steps:
[0090] Step a1, dynamically counting the load situation of each downlink subframe. Specifically, a statistical cycle may be set, and the load situation of each downlink subframe is counted in each statistical cycle, and the statistical cycle is the maximum value allowed to be configured in the DRX cycle. The statistical load situation of the downlink subframe may be the number of users waiting to be scheduled on each downlink subframe.
[0091] Step a2, according to the statistics of the load situation of each downlink subframe and the load balancing principle, evenly configure the DRX cycle starting point of the DRX user on each downlink subframe. Here, if a new DRX user joins, select the downlink subframe with the smallest load in the next statistical period as the DRX c...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com