Positioning settlement method of large steel suspension box or sinking well
A positioning method and steel hanging box technology, which can be applied to caissons, buildings, infrastructure engineering, etc., and can solve problems such as the difficulty of precise positioning of steel hanging boxes
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0015] The positioning of the large steel hanging box through the upstream anchor pier and the downstream anchor pier is as follows: figure 1 As shown, the upstream anchor pier 100 is connected to the large steel suspension box 400 through the stay cable, and the downstream anchor pier 300 is connected to the large steel suspension box 400 through the stay cable to realize the positioning of the large steel suspension box.
[0016] The plane size of the upstream anchor pier 100 is 17m×18m, and the substructure uses 16 φ1000×10mm steel pipe piles with a slope of 4:1 as the pile foundation. m, 4.0m; the distance between the four rows along the bridge is 4.5m, and φ600×8mm steel pipe parallel braces and φ400×6mm connection braces are set at the elevation +19.0m, and diagonal braces are set in two directions. The elevation of the platform top is +24.0m, and the platform adopts the structure of main steel box girder, main beam and distribution secondary beam. 2HN500×200mm H-shaped...
PUM