Method for blowing out blast furnace

A blast furnace, high-level technology, applied in the field of blast furnace shutdown, can solve the problems of high cost, short service life, and a lot of manpower and material resources

Active Publication Date: 2011-05-25
PANGANG GROUP VANADIUM TITANIUM & RESOURCES +1
View PDF0 Cites 17 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] Although the method of drawing water from the top of the empty material line to stop the furnace can reduce manpower and material resources, however, after the blast furnace is shut down by using the existing method of drawing water from the top of the empty material line to stop the furnace, the material line stays about 0.5 meters above and below the level of the tuyere , usually about 0.5 meters above the tuyere level, still need to pay a l

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for blowing out blast furnace
  • Method for blowing out blast furnace
  • Method for blowing out blast furnace

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0053] This embodiment is used to illustrate the method for shutting down the blast furnace provided by the present invention.

[0054] continuous direction figure 1 In the blast furnace shown (the height from the material line in the blast furnace to the level of the taphole before the shutdown is implemented is 19 meters), lump ore (containing 47% by weight of iron) and coke (containing 84% by weight) with a particle size of 6-50 mm are added. % carbon), and the weight ratio of the iron ore and coke in the mixture is 1:1.95, the total height of the blast furnace is 22 meters, and the average cross-sectional area is 71.78m 2 , the height from the level of the tuyere to the level of the iron mouth is 2.7 meters, the height from the level of the iron mouth to the bottom of the furnace is 1.3 meters, the level of the remaining iron mouth is 2.2 meters below the level of the iron mouth, and the diameter of the tuyere is 130 mm. The iron ore and coke The addition amount makes the...

Embodiment 2

[0061] This embodiment is used to illustrate the method for shutting down the blast furnace provided by the present invention.

[0062] continuous direction figure 1 The blast furnace shown (the height from the material line in the blast furnace to the level of the taphole before the shutdown is 20.5 meters) is charged with lump ore (containing 48% by weight of iron) and coke (containing 85% by weight) with a particle size of 6-50 mm. % carbon), and the weight ratio of the iron ore and coke in the mixture is 1:2.02, the total height of the blast furnace is 24 meters, and the average cross-sectional area is 72.83m 2 , the height from the level of the tuyere to the level of the iron hole is 3.5 meters, the height from the level of the iron hole to the bottom of the furnace is 1.5 meters, the level of the residual iron hole is 2.2 meters below the level of the iron hole, the depth of the iron hole is 2.2 meters, and the diameter of the tuyere is 130 mm, the addition of the iron ...

Embodiment 3

[0069] This embodiment is used to illustrate the method for shutting down the blast furnace provided by the present invention.

[0070] continuous direction figure 1 The blast furnace shown (the height from the material line in the blast furnace to the level of the taphole before the shutdown is 23.5 meters) is charged with lump ore (containing 48% by weight of iron) and coke (containing 85% by weight) with a particle size of 6-50 mm. % carbon), and the weight ratio of the iron ore and coke in the mixture is 1:1.8, the total height of the blast furnace is 26 meters, and the average cross-sectional area is 72.58m 2 , the height from the level of the tuyere to the level of the iron hole is 2.6 meters, the height from the level of the iron hole to the bottom of the furnace is 1.5 meters, the level of the remaining iron hole is 2.2 meters below the level of the iron hole, and the diameter of the tuyere is 140 mm. The iron ore and coke The addition amount makes the height of the f...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a method for blowing out a blast furnace. The method comprises the following steps of: continuously adding iron ore and a solid carbonaceous substance into a blast furnace before blown out so that the height from a stock level to the horizontal plane of an iron notch is 86-93 percent of total eight of the blast furnace; when the adding volume of mixed materials is 65-75 percent of the total volume in the blast furnace, stopping adding the mixed materials; then leading the height from the stock level to the horizontal plane of the iron notch to be 45-65 percent of the total eight of the blast furnace by an empty stock level, spraying water into the blast furnace and predamping down; then continuously spraying water into the blast furnace and blowing air the blast furnace so that the stock level is reduced; when at least one of the following three conditions is met, opening the iron notch for tapping and then opening a residual iron notch for discharging slag iron; (1) calculating that the stock level depth reaches the horizontal plane of an air opening by the air blowing amount; (2) generating a second peak value of CO2 content in a change curve of the CO2 content; and (3) turning the combustion flame of the air opening to be yellow green. By adopting the method for blowing out a blast furnace, the probability for reducing the stock level in the blast furnace below the horizontal plane of the air opening after blowing out is as high as more than 90 percent.

Description

technical field [0001] The invention relates to a method for shutting down a blast furnace. Background technique [0002] Existing blast furnaces can be, for example, such as figure 1 In the structure shown, the blast furnace includes hearth 1, tuyeres 2, iron ports 3, residual iron ports 4 and relief valve 5, residual iron ports 4 are below tuyere 2, iron ports 3 are located between tuyere 2 and residual iron ports 4 In between, the release valve 5 is arranged on the upper end of the blast furnace, and the number of the release valves can generally be 2-6. In the process of blast furnace ironmaking, the hearth 1 holds the charge, blows air into the blast furnace through the tuyere 2 or shuts off the charge in the blast furnace, and the refined molten iron flows out through the iron hole 3, and the release valve 5 is used for discharge The gas generated in the blast furnace is used to adjust the pressure in the blast furnace, and the residual iron port 4 is used to dischar...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): C21B5/00
CPCY02P10/20
Inventor 曾华锋谢俊勇杜斯宏林千谷杨兵张远祥邹春乐张海军张志刚
Owner PANGANG GROUP VANADIUM TITANIUM & RESOURCES
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products