Voltage building-up method in guide vane pre-opening mode for water pump working condition
A technology for working conditions and pumps, applied in the field of pre-opening and pressure building of guide vanes under working conditions of pumps, can solve problems such as damage to the unit, endanger the safe and stable operation of the power station, falling off of connecting pins, etc., and achieve the effect of ensuring the progress of the project
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0017] The present invention will be further described below in conjunction with embodiment.
[0018] A method for pre-opening guide vane pressure building in water pump working conditions, comprising the following steps:
[0019] (a) Pumped water phase modulation operation: Use a static frequency converter (SFC) or drive the pumped storage unit in a back-to-back (BACK TO BACK) manner to gradually increase the voltage and speed in the direction of the pump (the operation of the pumped storage unit includes the direction of the pump) and power generation direction), when the speed of the unit reaches 10% of the rated speed, open the main pressure valve and the air supply valve of the phase-adjusting water pressure system to compress the air, and press the water in the runner chamber of the turbine to the upper part of the draft tube; the runner of the turbine maintains Rotate in the air until the rated voltage is 15.75kV and the rated speed is 375r / m, and it is connected to the...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More