Unlock instant, AI-driven research and patent intelligence for your innovation.

Partitioning lifting construction method for huge weld ball net rack

A construction method and welding ball technology, which is applied in the processing of building materials, construction, building construction, etc., can solve the problems of unloading, high cost, and high construction difficulty.

Inactive Publication Date: 2011-06-22
CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF2 Cites 15 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

For the small-scale welded ball net frame, it can be hoisted directly by a crane, but at present, more and more super large welded ball net frames are encountered in the construction process. As a result, the construction is difficult and costly; secondly, for the super large welded ball grid, how to realize the unloading after the hoisting is completed has not been well resolved.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Partitioning lifting construction method for huge weld ball net rack
  • Partitioning lifting construction method for huge weld ball net rack
  • Partitioning lifting construction method for huge weld ball net rack

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] figure 1 It is a flow chart of the sub-block hoisting construction method of the super large welded ball net frame of the present invention. The present invention will be further described below in conjunction with specific examples. This example is implemented on the premise of the technical solution of the present invention, but the protection of the present invention The scope is not limited to this embodiment.

[0027] see figure 2 As shown, the roof of the pier corridor of Kunming New Airport is a super-large welded ball grid 10, and its curved space grid structure is a regular four-cone grid. The super-large welded ball net frame 10 is 407m long, the wider part 101 is 48m wide, the narrower part 102 is 28.611m wide, the maximum height is 2.9m, the minimum height is 2.3m, and the projected area is 60000m2.

[0028] see image 3 , Figure 4 As shown, the super large welded ball net frame 10 is made into a plurality of sub-network frames 11, and the platform tru...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a partitioning lifting construction method for a huge weld ball net rack. The huge weld ball net rack is lifted to a perpetual support pillar of a floor slab by the following steps of: a, making the huge weld ball net rack into a plurality of sub net racks; b, installing a plurality of temporary support pillars on the floor slab; c, crossing and lifting the sub net racks onto the perpetual support pillar and temporary support pillars, and remaining an inlaying section among the sub net racks after the lifting is finished; d, inlaying the inlaying sections, and connecting the sub net racks to form the huge weld ball net rack; and e, uninstalling the temporary support pillars. In the method, the huge weld ball net rack is made into the plurality of sub net racks to be lifted, the temporary support pillars are matched with the perpetual support pillar to be used as bottom support during lifting of the sub net racks, and all inlaying sections are inlaid after the sub net racks are lifted, thus all the sub net racks are connected into a whole, and the temporary support pillars are uninstalled finally, namely the lifting construction of the huge weld ball net rack is finished.

Description

technical field [0001] The invention relates to a hoisting construction method of a welded ball net truss, in particular to a sub-block hoisting construction method of a super large welded ball net truss. Background technique [0002] Welded ball grid is a grid structure with a wide range of applications. It can be used in industrial buildings such as warehouses and factories. Corridors, station waiting halls and other public buildings. For the small-scale welded ball net frame, it can be hoisted directly by a crane, but at present, more and more super large welded ball net frames are encountered in the construction process. As a result, the construction difficulty is relatively high and the cost is high; secondly, for the super large welded ball grid, how to realize the unloading after the hoisting is completed has not been well resolved. Contents of the invention [0003] In view of the above-mentioned problems, the present invention provides a sub-block hoisting const...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04G21/14
Inventor 唐际宇戈祥林石金荣廖功华张勋胜吴柳宁范波黄贵
Owner CHINA CONSTR EIGHT ENG DIV CORP LTD