Cantilever casting construction cradle with underlaid main truss
A technology of main truss and truss crane, which is applied in the field of cantilevered construction hanging basket under the main truss, which can solve the problems of lagging continuous beam pouring period, insufficient construction space, and occupation of upper construction space, etc., and achieves the convenience of hanging basket elevation and forward movement The effect of stable process and saving construction space
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0020] refer to figure 1 , Figure 5 , this embodiment includes a main truss 4 and a running mechanism. The main truss 4 is symmetrically placed on both sides of the lower part of the poured beam 9; 43; the upper part of the main truss hanger 43 reaming holes is provided with a vertical groove 100 in the same direction; the upper part of the front end of the poured beam 9 is horizontally installed with a rear beam 1, and the two ends of the rear beam 1 are respectively connected to one end of the C-shaped arm 2, and the C The other end of shaped arm 2 is vertically downward, and its end horizontally stretches in the vertical groove 100 of described main truss hanger 43.
[0021] refer to figure 2 , Figure 4 . The supporting rolling device is a supporting oil cylinder 41 and a roller frame 42 installed on the upper edge of the main truss 4 in sequ...