Construction method for replacing cooling wall of blast furnace by utilizing movable hanging scaffold
A technology of movable hanger and construction method, applied in the direction of cooling device, etc., can solve the problems of long occupation time, unfavorable safety construction and high cost, and achieve the effect of shortening construction time, improving installation efficiency and low cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach
[0024] 1. Production of movable hanging pan
[0025] The movable hanging pan is made at the bottom of the blast furnace, and the bottom of the furnace is first leveled to meet the conditions for making the movable hanging pan. Make the main beam 1, which is welded into a square frame shape by four equal-length I-beams; make the ring beam 4, which is rolled by channel steel, and then welded to the main beam 1, and the top of the main beam 1 and the ring beam 4 are kept on the same plane Inside; the fixed arm 2 is assembled and welded with channel steel, which is welded on the central tube 5, and then welded with the main beam and the ring beam, and the telescopic arm 3 will be inserted into the fixed arm 2 at the same time. The movable suspension frame is formed like this. After the movable hanging pan frame is formed, the platform steel plate 6 is laid, and the position of the hanging point 8 will be reserved at the same time, and finally the plank 7 is fastened. In this way...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 