Barrier-free decoration structure of high and low incorporated buildings and construction method thereof

A barrier-free and architectural technology, which is applied in the direction of building structure, construction, and building material processing, can solve the problems of low-rise buildings that cannot be used, and achieve the effects of improving utilization, saving procedures, and speeding up construction progress

Active Publication Date: 2011-11-23
姚攀峰
View PDF7 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to provide a barrier-free decoration structure and construction method of high-low conjoined buildings, to solve the technical problem that low-rise buildings cannot be used before high-rise buildings are completed due to differences in settlement of high-low conjoined buildings

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Barrier-free decoration structure of high and low incorporated buildings and construction method thereof
  • Barrier-free decoration structure of high and low incorporated buildings and construction method thereof
  • Barrier-free decoration structure of high and low incorporated buildings and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0040] Embodiment one sees figure 1 As shown, a barrier-free decoration structure of high and low conjoined buildings, the low building and the high building are connected as a whole through connecting horizontal members, and the connecting horizontal member 3 is a reinforced concrete member, and one end of it is supported on the main structure of the low building. The other end is supported on the stressed member 2 of the main structure of the high building. The bottom surface of the connecting horizontal member 3 is supported by a supporting beam. At least two post-casting joints 5 are left on the connecting horizontal member 3. The rear The pouring joint 5 is located within the length range of the supporting beam, and metal mesh 9 is arranged on both sides thereof, and the stressed steel bar 4 connecting the horizontal member is long at the rear casting joint 5 . The metal mesh 9 usually adopts a quick and easy closing mesh.

[0041] The stress-bearing member 2 of the main...

Embodiment 2

[0045] Embodiment two see Figure 2 ~ Figure 4 , the difference from Embodiment 1 is that the support beam is a longitudinal support beam 7, and its two ends are placed on the structural beam of the adjacent span, and the structural beam of the adjacent span is connected with the structural beam of the adjacent span through the connecting piece 12 and the bolt 13, and the embedded part 6 Welding or a combination of welding and bolting. The structural beams are reinforced concrete beams or shaped steel beams.

Embodiment 3

[0046] Embodiment three see Figure 5 , different from Embodiment 1, the stressed member 2 of the main structure of the high building and the stressed member 1 of the main structure of the low building are columns or walls, the connecting horizontal member 3 is a beam, and the supporting beam is a transverse supporting beam 8. It is fixedly connected with the high building force-bearing component 2 and the low building force-bearing component 1 through the embedded parts.

[0047] For details of the embedded part 6, refer to Figure 6 and Figure 7 , consisting of a pre-embedded steel plate 6.1 and a pre-embedded anchor 6.2, the pre-embedded steel plate 6.1 is one or two pieces, the pre-embedded anchor is a steel bar or an angle steel, arranged between two pre-embedded steel plates 6.1, and 6.1 Welding connection of embedded steel plate.

[0048] The supporting beams can also be directly buried in the main structure of the high building main structure and the main structure...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a barrier-free decoration structure of high and low incorporated buildings and a construction method thereof, post-pouring joints are arranged at a horizontal connecting part for the high and the lower buildings, which is close to the ends of the high and the low buildings, and support beams are arranged in the positions for setting the post-pouring joints on the bottom surface of the horizontal connecting part, thereby solving the differential settlement problem of the high and the low buildings, simultaneously solving the problem of enabling the low-rise building tobe used as early as possible after completing the structure, having the advantages of simple construction measures, flexibility, effects of accelerating the construction progress and realizing economic benefits as early as possible and the like and being capable of being widely applied in construction of high and low incorporated structures.

Description

technical field [0001] The invention relates to a conjoined building and a construction method thereof. Background technique [0002] With the continuous increase in the scale of urban buildings and the continuous development of anti-seismic technology, more and more high and low buildings are connected into a whole, forming a well-proportioned architectural aesthetic, and at the same time, it will also bring the buildings due to height differences. Potential safety hazards such as differential settlement, if these hidden dangers are not well resolved during the construction process, it is very likely to cause structural cracks or even damage. In order to solve the above problems, the current common practice is to leave a post-casting joint of about 1m in the middle of the connecting span, and pour the post-casting concrete after the settlement of the high and low buildings on both sides is stable. This technology has the following problems: low-rise buildings are often co...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04B1/38E04B1/41E04G21/00
Inventor 姚攀峰
Owner 姚攀峰