Method for detecting prestress construction quality of anchoring engineering
A construction quality and prestressing technology, which is applied in basic structure engineering, earthwork drilling, installation of anchor rods, etc., can solve the problems that have not yet been effectively tested, and there are no technical means and methods
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Example Embodiment
[0061] Example 1
[0062] For an existing anchoring project in which the length of the steel strand used for tensioning meets the required length for tensioning, the method for detecting the quality of the anchoring project of the present invention includes the following steps:
[0063] Step a: Install the tensioning device using the existing anchor cable tensioning test installation steps:
[0064] a 1 . Arrange the clip limit plate on the working anchor of the existing anchoring project, pass the steel strand remaining from the existing anchor project through the jack, and the bottom of the jack is placed on the clip limit plate;
[0065] a 2 . Install the working anchor on the upper part of the jack, pass the remaining steel strand through the tool anchor, and then place a tool clip in the tool anchor to tighten the remaining steel strand;
[0066] Step b: Perform a pull test:
[0067] b 1 . Apply initial load to make the tensioning devices closely connected;
[0068]...
Example Embodiment
[0070] Example 2
[0071] For the existing anchoring project in which the steel strand used for tension detection has been cut and cannot meet the required length for tensioning, it is necessary to install the quality detection device for the existing anchoring project of the present invention before adopting the detection of the present invention method to detect.
[0072] like figure 1 , 2 As shown, the device for quality inspection of existing anchoring projects of the present invention includes three parts: a connecting part, a supporting part and a limiting part, and each part will be described in detail below with reference to each view.
[0073] The first part: the connecting part, including: the first tool anchor 21 , the second tool anchor 23 and the connecting sleeve 22 .
[0074] like figure 1 , figure 2 , image 3 As shown, the first tool anchor 21 is a cylindrical plate with substantially the same size and shape as the working anchor 13 in the existing an...
PUM
Property | Measurement | Unit |
---|---|---|
Outer diameter | aaaaa | aaaaa |
Thickness | aaaaa | aaaaa |
The inside diameter of | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap