An underground gasification and well structure technology, which is applied in coal gasification, underground mining, earth-moving drilling and other directions, can solve the problem that the local coal seam cannot be gasified and burned, the gas outlet or ground pipeline is blocked, and the supply of gasification agent is not in place, etc. problems, to achieve the effect of being conducive to penetration, prolonging service life and reducing ash accumulation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0035] The depth of the hole is 500 meters below, the pre-gasification coal seam position is 484~495 meters, and the net coal thickness is 8 meters as an example to illustrate the implementation steps of the present invention:
[0036] Complete the drilling and coring construction with a depth of 500 meters in the open hole;
[0037] According to the coring results, it is determined that the lower end of the petroleum steel casing is 486 meters, and the lower end of the glass steel pipe is 492.5 meters;
[0038] Connect the 6.5-meter-long glass steel pipe to the petroleum steel casing, and use the screw connection method to lower the glass steel pipe to 486 meters underground;
[0039] Lower the oil steel casing to about 0.5 meters above the ground (install the ground pipe network);
[0040] Carry out post-drilling construction, cementing, through-hole completion, well logging, hydraulic testing, etc.
example 2
[0042] The depth of the hole is 480 meters below, the pre-gasification coal seam position is 470~478 meters, and the net coal thickness is 6 meters as an example to illustrate the implementation steps of the present invention:
[0043] Completed the drilling and coring construction with a depth of 480 meters in the open hole;
[0044]According to the coring results, it is determined that the lower end of the petroleum steel casing is 468 meters, and the lower end of the PE pipe is 475.5 meters;
[0045] Connect the 7.5-meter-long PE pipe to the petroleum steel casing, and use the screw connection method to lower the PE pipe to 475.5 meters underground;
[0046] Lower the oil steel casing to about 0.5 meters above the ground (install the ground pipe network);
[0047] Carry out post-drilling construction, cementing, through-hole completion, well logging, hydraulic testing, etc.
example 3
[0049] The depth of the hole is 580 meters below, the pre-gasification coal seam position is 570~578 meters, and the net coal thickness is 6 meters as an example to illustrate the implementation steps of the present invention:
[0050] Completed the drilling and coring construction with a depth of 580 meters in the open hole;
[0051] According to the coring results, it is determined that the lower end of the petroleum steel casing is 568 meters, and the lower end of the PVC pipe is 575.5 meters;
[0052] Connect the 7.5-meter-long PVC pipe to the petroleum steel casing, and use the screw connection method to lower the PVC pipe to 575.5 meters underground;
[0053] Lower the oil steel casing to about 0.5 meters above the ground (install the ground pipe network);
[0054] Carry out post-drilling construction, cementing, through-hole completion, well logging, hydraulic testing, etc.
[0055] According to the drilling well body structure and method thereof of the present invent...