Centralized control cabinet for transformer sleeve test and use method thereof
A technology for transformer bushings and centralized control boxes, applied in the direction of testing dielectric strength, etc., can solve problems such as high labor intensity, reduce quantity and labor intensity, eliminate violations, and ensure personal safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] The panel is made of 0.8cm thick insulating board, and the panel is pasted with insulating paper; the jack 1 is set on the panel, and the jack 1 is connected with the moving contact of the single-phase isolating switch 2 through internal wiring. The signal line jacks on the bridge are consistent; the static contacts of the single-phase isolating switch 2 are connected to each other and grounded through the grounding terminal. The single-phase isolating switch is connected with an operating handle, and the operating handle is processed by an insulating plate, and its insulation strength is sufficient to withstand the voltage during the insulation resistance test, thereby ensuring the personal safety of the staff.
[0036] Using method of the present invention comprises the following steps:
[0037] Taking the test of 220kV transformer as an example, the bushing insulation resistance test is carried out. The bushing insulation resistance test is actually to measure the in...
Embodiment 2
[0040] The structure of the centralized control box of this embodiment is the same as that of Embodiment 1; the casing dielectric loss test method comprises the following steps:
[0041] Before the test, close all the isolating switches and ground them through the grounding terminals on the panel; lead all the test lines from the end screens of the transformer bushings to the bottom according to the phases, and insert them into the signal line jacks. When carrying out the dielectric loss test of the bushing, in order to avoid the phenomenon of discharge due to the ungrounded end screen of the bushing, first connect all the test lines to the signal line jack; then connect the test line of the bushing to be measured from the plug Pull it out from the dielectric loss bridge and insert it into the dielectric loss bridge. The non-test can ensure reliable grounding; after the test is over and the test power is disconnected, pull out the test line from the dielectric loss bridge and i...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com