Pre-warning system and method for operation safety of railway maintenance
A safety early warning system and safety early warning technology, applied in the direction of railway signal and safety, etc., can solve the problems that cannot satisfy the measurement of large angle range
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach
[0063] The following is attached figure 2 And attached Figure 5 Describe the basic work flow of the railway maintenance operation safety early warning system, a specific implementation of the railway maintenance operation safety early warning method, including the following steps:
[0064] S100: the image collection unit 2 collects image information of the construction site;
[0065] S101: The calculation control unit 1 performs image preprocessing on the image information collected by the image acquisition unit 2, and performs matching calculation on the processed information with the railway line equipment template stored in the calculation control unit 1, to determine the type of railway line equipment;
[0066] In order to perform matching calculations, the system classifies and abstracts railway equipment and signs that affect construction safety into models in advance, as shown in the attached Figure 6 to attach Figure 10 As shown, the railway line equipment templ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com