Method for determining construction sizes of tunnel and cavern
A technology of tunnel construction and size, applied in tunnels, earth-moving drilling, mining equipment, etc., can solve the problems of neglecting the bearing capacity of surrounding rocks, waste of human and financial resources, and being too conservative, so as to reduce artificial support, reduce construction costs, Reasonable effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
[0022] figure 1 The implementation flow of the method for determining the construction size of the tunnel chamber provided by the embodiment of the present invention is shown. The method steps are as follows:
[0023] S101: Measure the natural stress with a hollow-core inclusion triaxial geostress gauge, and determine the natural horizontal stress σ of the rock mass in the stratum through which the tunnel passes hav and the vertical stress σ h ;According to the formula μ=σ hav / σ h Calculate the natural stress ratio coefficient of the tunnel passing through the formation;
[0024] The measur...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com