Data modification and reloading system of LKJ
A train operation monitoring and recording device technology, applied in the control system of the transportation center, transportation and packaging, railway car body parts, etc., can solve the problems of basic line data modification and replacement workload, repetitive and invalid work, etc., to increase the workload Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0018] combine figure 1 , the existing train monitoring device work process, the IC card data is ready in the dispatch room, and the driver receives the IC card at first to the dispatch room to accept the work task. The IC card includes the driver's serial number, the train crossing road this time, the temporary speed limit in the crossing road, etc. The driver inserts the IC card into the train monitoring device after getting on the train, and the train monitoring device reads the data of the IC card, and the train is ready to depart.
[0019] combine figure 2 , the train monitoring device work process of the present invention, the IC card data is prepared in the dispatching room, and the driver accepts the task to receive the IC card at first to the dispatching room. The IC card includes all the original data and adds a version number of the basic line data corresponding to the train crossing this time. The driver inserts the IC card into the train monitoring device afte...
PUM

Abstract
Description
Claims
Application Information

- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com