Underground cavern drainage blind ditch device
A technology of drainage blind ditch and underground cavern, which is applied in construction and infrastructure engineering, etc., can solve the problems that plastic blind ditch cannot be in good contact with seepage rock wall, installation and operation of plastic blind ditch is inconvenient, and the joint position is not easy to fix, etc. Achieve good drainage effect, reliable construction quality and good bonding effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0020] For underground caverns with a diameter of less than 6m, the construction method of the rubber drainage blind ditch is to open several small circular holes on the wall of a circular rubber pipe 2 with a wall thickness of 1cm and a circular section with an outer diameter of 5cm. Hole 1, the diameter of the round holes on the pipe wall is 2 cm, the distance between the round holes is 4 cm, and there are 4 rows in total. The round holes are arranged in a plum-shaped pattern along the length of the pipe wall. The outer wall of the rubber tube 2 and the three-way or four-way rubber tube connector is wrapped with a water-filtering geotextile 5 and a water-impervious geotextile 4. One side of the geotextile is away from the permeable rock wall. Fix the rubber tube wrapped in geotextile on the rock surface with a stainless steel fixing card, install an Ω-shaped fixing card 6 every 20-40cm, and nail the two ends of the fixing card on the rock surface with a nail 8. After the co...
Embodiment 2
[0022] For underground caverns with a diameter ≥ 6m, the construction method of the rubber drainage blind ditch: open several trapezoidal rubber pipes on the wall of the trapezoidal rubber pipe 3 with a wall thickness of 1cm, a trapezoidal section with an upper bottom length of 5cm, a lower bottom length of 15cm, and a height of 8cm. Circular small hole 1, the diameter of the circular small hole is 3cm, a row of round holes is arranged on the upper bottom side pipe wall with a hole distance of 8cm, and three rows of round holes are arranged on the lower bottom side pipe wall with a row distance of 4cm and a hole distance of 8cm. Two rows of round holes are arranged on each side pipe wall, the row distance is 4cm, and the hole distance is 8cm. The round holes on the pipe wall of the rubber pipe with trapezoidal section are arranged in a rectangular shape along the length direction of the pipe wall. The outer wall of the rubber tube 2 and the three-way or four-way rubber tube con...