Main bus chamber of ring main unit
A technology of main busbar room and ring network cabinet, applied in the field of ring network cabinet, can solve the problems of lack of a good solution, influence of power supply reliability, and increased probability of power outage, etc., to achieve accurate guidance, small size, and reduction of power outages. the effect of the number of times
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0025] Such as figure 1 As shown, a main busbar room of a ring network cabinet includes a cabinet top box 10 installed on the top of a switch cabinet 40, two sets of static contact bushings 20 arranged in each cabinet top box 10, and a The shutter device 30 in the box 10 is provided with a cabinet-top box 10 at each position reserved for assembly.
[0026] Such as figure 2 As shown, the inner side wall of the cabinet top box 10 is provided with a grounding bus 101 connected to the grounding device of a special handcart for cabinet assembly, which can ensure the safety of operation and operation. The inner wall of the cabinet top box 10 is provided with a guide rail 102 for guiding and positioning the dedicated handcart for assembling, which can ensure that the dedicated handcart for assembling can find an accurate position when it is pushed.
[0027] Such as image 3 , Figure 4 As shown, each set of the static contact bushing 20 includes a contact housing 201 fixed on the top of ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 