Power grid load forewarning management method and system
A technology of power grid load and management method, applied in the direction of electrical components, circuit devices, AC network circuits, etc., can solve the problems of increased analysis difficulty, low work efficiency, delay, etc., to facilitate staff monitoring, improve work efficiency, and intuitive display clear effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0041] like figure 1 As shown, the power grid load early warning management system includes an automatic data acquisition device 1, the output of the automatic data acquisition device 1 is connected to an input unit 201, and the input unit 201 is provided with a real-time clock 201a and a pulse circuit 201b, and the pulse output of the pulse circuit 201b Terminal is connected with the control terminal of automatic data acquisition device 1;
[0042] The output end of the entry unit 201 is connected with a storage module 202, and the grid load information is input through the charge information input end of the storage module 202, and the other input end of the storage module 202 is a map information input end, and the map information input end is connected with a control module 301, the output end of the storage module 202 is connected to the analysis module 203 through the information input end, the output end of the analysis module 203 is connected to the output module 302, ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com