A technology of obstacle removal during construction, applied in the field of obstacles, can solve the problems that obstacles such as rocks and other obstacles cannot be removed by pipe cleaning and blasting, and site conditions are limited, so as to achieve convenient implementation, short obstacle removal period, and low cost of rock breaking Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0010] Below in conjunction with specific examples, the implementation manner of the patent of the present invention is further described. It should be understood that these examples are only used to illustrate the patented invention and are not intended to limit the scope of the patented invention. In addition, it should be understood that after reading the content taught by the patent of the present invention, those skilled in the art can make various changes or modifications to the present invention, and these equivalent forms also fall within the scope defined by the appended claims of the present application.
[0011] The specific implementation method of the present invention will be described in combination with the punching, rock-breaking and barrier-clearing construction of the original water pipe and canal relocation project of Xiamen Jixing Seawall.
[0012] Firstly, a construction site is filled in the rock-breaking area, and the punching pile machine is in place t...