A measurement scheduling method and device for multi-mode single-standby user equipment
A user equipment, multi-mode and single-standby technology, applied in electrical components, wireless communication, etc., can solve problems such as improper sequence, inability to complete measurement, etc., to achieve the effect of improving accuracy, real-time performance, and good mobility performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach
[0096] As a preferred implementation manner, the scheduling of measurement objects between measurement time periods according to priority adopts a dynamic measurement time period scheduling method, which specifically includes the following steps:
[0097] Step 104A-1, if the measurement time period is available, proceed to step 104A-2, otherwise, proceed to step 105;
[0098] Step 104A-2, according to the priority of the measurement object, judge whether the measurement object is schedulable and can be effectively scheduled, if the condition is met, schedule the measurement object in the current measurement time period, and mark the number of measurement time periods required by the measurement object as Unavailable, go to step 104A-3, otherwise, go to step 105;
[0099] Preferably, if there are multiple measurement objects with the same priority, these measurement objects are scheduled in order;
[0100] The meaning of being schedulable is: the scheduling times of TypeA and ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 