Closure construction method of cable-stayed bridge
A construction method and technology for cable-stayed bridges, applied in the direction of bridges, bridge construction, erection/assembly of bridges, etc., can solve problems such as the influence of the internal force state of the completed bridge, large time, cost, etc., and achieve the effect of linearity and internal force satisfaction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] The present invention will be further described in detail below through specific embodiments in conjunction with the accompanying drawings. The following examples are only descriptive, not restrictive, and cannot limit the protection scope of the present invention.
[0026] A closing construction method of a cable-stayed bridge is based on the following theory: use the retrograde analysis method to simulate the closing state and guide the construction as shown in the figure below: After the beam section at the end of the largest cantilever is hoisted, the largest cantilever end corresponds to the stay cable Stretching to a certain cable force, so that under the action of the construction load in the closing stage, the calculated value of the internal force of the closing joint is 0; in the actual construction process, a construction process of secondly tensioning the outermost cable-stayed cables after closing is added, At this time, the unstressed cable length of the s...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
