A supporting structure and construction method technology, applied in the direction of infrastructure engineering, excavation, construction, etc., can solve the problems of difficult construction, slow construction speed, long construction period, etc., and achieve low construction difficulty, fast construction speed and short construction period Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] Design the supporting structure of the entire deep foundation pit, prepare a safe construction plan, and discuss the plan with experts; design the static explosion reserved groove 4 with a diameter of 30 mm, a groove depth of 700 mm, and a groove spacing of 250 mm; select a number of PVC pipes with an outer diameter of 30 mm, The length of the intercepted PVC pipe is 800-900 mm, and one end of the PVC pipe is sealed with waterproof tape; several PVC pipes are tied to the stirrups of the support beam according to the designed groove depth of 700 mm and the groove spacing of 250 mm in step 2, and the tape is closed One end is down; according to the safety construction plan in step 1, the concrete pouring of the entire deep foundation pit support structure is carried out; after the concrete solidification time is 120 minutes, turn the PVC pipe 90 degrees, and then pull out the PVC pipe to form a static explosion reserved groove 4 . The concrete is fully set.
[0041] The ...
Embodiment 2
[0043] Design the supporting structure of the entire deep foundation pit, compile a safe construction plan, and expertly demonstrate the plan; design the static explosion reserved groove 4 with a diameter of 40 mm, a groove depth of 800 mm, and a groove spacing of 300 mm; select a number of PVC pipes with an outer diameter of 40 mm, The length of the intercepted PVC pipe is 900-1000 mm, and one end of the PVC pipe is sealed with waterproof tape; several PVC pipes are tied to the stirrups of the supporting beam according to the designed groove depth of 800 mm and the groove spacing of 300 mm in step 2, and the tape is closed One end is down; according to the safety construction plan in step 1, the concrete pouring of the entire deep foundation pit support structure is carried out; after the concrete solidification time is 150 minutes, turn the PVC pipe 180 degrees, and then pull out the PVC pipe to form a static explosion reserved groove 4 . The concrete is fully set.