Large-span concrete continuous girder bridge side span folding device and method
A concrete and long-span technology, applied in the direction of bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of difficult operation of elevation adjustment, high cost, complicated process, etc., and achieve the effect of solving complex construction process
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] The present invention will be described in further detail below in conjunction with the accompanying drawings and embodiments.
[0026] Such as figure 1 Shown is the long-span concrete continuous girder bridge structure involved in the present invention, wherein after the main pier 4 and side pier 5 are completed, the beam section 1 is started to be cantilevered in sections, and the beam section is closed at the middle span between the main piers 4. The span closing section 2, the closing section between the cantilever pouring beam section 1 and the side pier 5 is the side span closing section 3, and the main difference of the side span closing device in this embodiment is that the hanging basket 6 is completely integrated with the cantilever pouring beam section 1. Anchored, supported by the closing strut 7 on the side pier simultaneously.
[0027] The frame folding device of this embodiment is as figure 2 and image 3 As shown, it includes two hanging basket truss...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com