Four-point positioning and installation method of steel box girder segment
An installation method and technology of steel box girder, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve problems such as large errors and large human factors, and achieve the effect of ensuring accuracy, avoiding correction, and simple operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
[0021] Such as Figure 1 ~ Figure 3 As shown, the four-point positioning installation method of the steel box girder segment includes the following steps:
[0022] S1. First divide the steel box girder box into sections according to the design drawings of the steel box girder box. The steel box girder box is divided into M steel box girder sections along its length direction, and then divided along its width direction For N steel box girder segments, number all steel box girder segments in turn. The steel box girder segment number is MN, and the number MN is 11, 12, ..., 1N, 21, ..., M1, M2, ..., ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 