Long-wall overlying strata settlement coordination water-preserving coal mining method

A water-retaining coal mining and coordinated technology, applied in ground mining, earth square drilling, underground mining, etc., can solve problems such as backward mining technology of room and pillar coal mining, deterioration of ecological environment in mining areas, and inability to obtain economic benefits, so as to avoid Submersible seepage, coal mining method is simple, and the effect of high promotion and application value

Inactive Publication Date: 2015-03-04
XIAN UNIV OF SCI & TECH
View PDF5 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The mine used the room-and-pillar mining method in the past. The mining technology of the room-and-pillar mining method is backward, frequent relocation, large coal pillars, waste of coal resources, and high economic benefits cannot be obtained.
Then it was changed to ordinary strip mining. Although the purpose of water conservation has been achieved, the recovery rate of coal has been limited, and the waste of resources is serious.
However, the continuous mining practice of the longwall working face in the nearby mining area has proved that the overlying rock damage will immediately spread to the bedrock surface and the surface, thereby seriously damaging the diving, leading to a sharp drop in water level and underground water gushing accidents, resulting in the deterioration of the ecological environment of the mining area and the threat of floods

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Long-wall overlying strata settlement coordination water-preserving coal mining method
  • Long-wall overlying strata settlement coordination water-preserving coal mining method
  • Long-wall overlying strata settlement coordination water-preserving coal mining method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0039] In this embodiment, the coal seam mined is the 2-2 coal seam of the 1011 working face of the Yanghuo Coal Mine in the Shenfu Mining Area. It is 15m, which is a relatively strong water-resisting layer. Among the overlying strata on the working face, No. 4 and No. 8 rock strata form a combined key layer, which jointly bear the load of the upper loose layer. The thickness of the combined key layer on the coal seam is 12.8m. When the longwall overlying rock coordinated caving and water conservation mining is carried out on this coal seam, the mining process is as follows:

[0040] Step 1. Divide the mining area and working face: divide the mining area and working face according to the scope of the well field;

[0041] In this embodiment, the mine field is 1200m incline wide and 6000m long in the mine field direction, and the mine field is divided into 4 mining areas, each mining area is 600m incline wide, and each mining area is 3000m long in direction; each mining area is...

Embodiment 2

[0054] In this example, the mined coal seam is Lanliang Coal Mine 2012 Working Face 2 in Shenfu Mining Area. -2 Coal seam, the average inclination angle of the coal seam is 1.0°, the average thickness of the coal seam is 2.67m, the average thickness of the loose layer is 50m, and the thickness of the water-resisting layer is 20m; in the overlying strata on the working face, No. 3 rock formation and No. 7 rock formation form a combination The key layer jointly bears the load of the upper loose layer, and the thickness of the combined key layer on the coal seam is 20m. When the longwall overlying rock coordinated caving and water conservation mining is carried out on this coal seam, the mining process is as follows:

[0055] Step 1. Divide the mining area and working face: divide the mining area and working face according to the scope of the well field;

[0056] In this embodiment, the mine field is 1440m incline wide and 6000m long in the mine field direction. The mine field i...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a long-wall overlying strata settlement coordination water-preserving coal mining method. The method comprises the following steps: I, partitioning a mining area and a working face; II, determining a working face coal mining method as the long-wall overlying strata settlement coordination water-preserving coal mining method, namely propelling by length L to form a first strip, reserving a filling coal pillar being D1 in the width, propelling by length L at another place to form a second strip, and reserving a support coal pillar being D2 in the width, wherein an area between two adjacent support coal pillars is taken as a settlement coordination area; III, determining mining parameters of the long-wall overlying strata settlement coordination water-preserving coal mining method, namely 301, determining the length L' of the settlement coordination area, 302, determining a strip propelling length L, 303, determining the width D2 of each support coal pillar, and 304, determining the width D1 of the filling coal pillar; and IV, mining on the working face. The coal mining method is simple and convenient to implement. The coal recovery ratio is increased greatly, rich water resources in mining areas with water shortage are protected, ecological environments of the mining areas are prevented from being damaged, and thus the coal mining method is high in practicability.

Description

technical field [0001] The invention belongs to the technical field of coal mining, and in particular relates to a coal mining method for coordinated settlement and water conservation of longwall overlying rock. Background technique [0002] Yushenfu Coalfield is located in the border area of ​​the arid and semi-arid Mu Us Desert and the Loess Plateau, with poor water resources, barren land, sparse vegetation and fragile ecological environment. The environmental quality in the natural state shows a downward trend, and the large-scale development of the coal industry has accelerated this trend in this area. The phreatic water existing in the Salawusu Formation in the coalfield plays a key role in the local ecological environment, and because the coal seam is buried shallowly, the mining damage will immediately spread to the bedrock surface and the surface, thereby seriously destroying the phreatic water, resulting in a sharp drop in the water level. Plants withered, crops di...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21C41/16
Inventor 张杰
Owner XIAN UNIV OF SCI & TECH