Assembly method for anchor bolt sleeve frame
An installation method and a bolt-sleeve frame technology are applied in the field of installation of construction facilities, which can solve the problems of long installation period, poor installation accuracy and low efficiency, and achieve the effect of ensuring stability and avoiding mutual interference.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] The following clearly and completely describes the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, but not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0029] An embodiment of the present invention provides a method for installing an anchor bolt sleeve, figure 1 Shown is this method flowchart, comprises the following steps:
[0030] Before hoisting, the high-strength anchor bolt and the sleeve frame are assembled into an overall structure anchor bolt support frame, and the overall structure anchor bolt support frame is transported to the installation site; the first beam of the sleeve frame and the frame body of the sleeve frame are connected by a detachable movable connection ; ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 